Village Association Director Meeting Minutes

05/17/05

 

Logistics:

   Date:      Tuesday May 17, 2005

   Time:      7:00 AM to 9:00 PM EST

   Location: Ries Village Unit #227

   Off site call in: 802-434-3018

 

Objective:

Finalize mailing and agenda for annual owners meeting 06/25/05.

Please find attached preliminary mailing and related information.

 

Outstanding 2005 Owners Meeting Preparation Tasks:

   -04/25/05 email, Solicited meeting room reservation confirmed, $100

          -No food, just coffee and juice

           -Not open to public

   -04/25/05 email, Bob Fries confirmed about State of Mnt update

   -Tuesday May 17, 2005 7-9 PM, Director conference call

   -Directors should not be improvising discussions, need bulleted scripts from each director

 

Objectives:

   -Owners meeting is not for the Directors to debate Assoc. actions or direction

   -Assoc, direction and actions will be agreed upon before the owners meeting

   -Owners meeting is for the owners to voice their options, to be updated and vote on 

     board/owners proposed actions

   -Do not defend a position, use bottom up approach of asking what results would you like to

     see

   -Meeting will start and end on time, need to put ‘must have’ votes up first

 

Common theme throughout all discussions

   -Assoc. has documented processes in place

   -Keeping owners informed

   -Involving owners in decision making process

   -Sense of community

 

Proposed Attachments to Agenda:

   -2004 annual report

   -2004 Budget

   -2005/2006 proposed budget

   -Maintenance task list

   -Committee open action Items

   -New R&R doc, w/ grill ban, common interest ownership act

   -Owner Survey

   -Owners Proxy

   -Village contact list

   -McLeod Water quality report

   -Outstanding window replacement list

 

 

Section 2.05 Notice of Meetings. The Secretary shall mail to each Unit Owner a notice of the place, date, hour and purpose or purposes of each annual or special meeting of the Unit Owners. The notice shall be mailed not less than seven (7) days, nor more than thirty (30) days, before the date of such meeting.
Meeting Roles and Responsibility:

 

Joe Boylan – Village Property Agent

Building maintenance status and Assoc. accounting status

   -Finance status

   -Delinquent fee status and action plan

   -Collect 1.5% monthly interest on fees 60 days delinquent

   -Status of approved maintenance tasks

 

Joe Kareivis – Village Director

   -Renters Code of Conduct Unit posting

   -Fire warden following up on grill ban

 

Dan Plimpton – Village Director

   -Window inventory

    -Light inventory

   -Communal grilling area proposal

 

Dave Parot --- Village Director

   -Bolton Fire District

   -Building/Unit Surveillance

   -Misc. Maintenance Task items

   -Lawn maintenance point person

   -Snow removal point person

   -November Freezing pipe memo to owners

   -Unit Maintenance memo

    -Propane Fixed Pricing

   -Review highlights of Maintenance Task List

 

Kurt Ries – Village Director

   -Chair Meeting

   -Insure Robert Rules of Order meeting criteria is conformed to

   -Establish quorum

   -Take minutes/notes

   -Keep agenda and timelines

   -Insure discussions are tabled or voted on

   -Keep discussion on topic and on track

   -Review and vote accept 2004 years minutes

   -Review R & R and vote

   -Owners forum action items

   -Owner survey

   -Solicit director’s end of  3yr terms 2006

   -Village financial goals and objectives

   -Review of 2004 budget

   -Vote on 2005 budget

   -Vote on charging interest on delinquent Assoc fees

 

Proposing Kurt and Joe K to sit together and Dan, Dave and Joe B distribute themselves amongst the owners.

   -Assist in answer question and monitor discussions

 


Agenda:

 

9:00 – 9:20 State of the Mountain Update

Bob Fries Owner of Bolton Valley Resort

   -Business plan on track

   -Current growth / potential growth

   -Resort Improvements

   -Redstone development updates

   -Thoughts on real estate values

   -Time share update

   -Opening day ski season

   -BV/Redstone Nordic trail improvements

   -Summer events, Mnt Biking, BAC, etc.

    -etc...

 

9:20 – 9:30 Bolton Valley Fire District Update

Kurt Ries, Village Director

   -Business plan on track

   -Projected cost saving and benefits to BV residents

  

Steve McLeod Drinking Water Quality Report

   -Assoc. not going to be involved

    -As unit owners we are involved

   -Steven McLeod write-up

   -01/17/05, Steve emailed a write-up

   -This maybe a done deal with the Redstone memo of 12/27/04

   -Question remains on what Redstone's action is to fix

   -Question remains on what Fire District's action would be to fix

 

9:30 – 9:40 Bolton Valley Presidents Console Update

Kurt Ries, Village Director

   -Common Rules and Regulations docs

   -Leverage common service providers for better price point

   -Propane Coop

 

9:30 – 9:40 Association 2004/2005 Successes

 Kurt Ries Village Director

   -Review and approve 2004 annual meeting minutes

   -Next Village Annual Meeting 06/24/06, last Saturday of June

 

VOTE

 

Acceptance of 2004 annual meeting minutes

 

Before we address concerns and issues lets talk successes

    -Maintaining and verifying an accurate owner contact list

    -Keeping owners informed of Assoc. action with email and newsletters

    -Controlled cost on a budget and funded $90k vinyl siding

    -Wentworth II condos assessing one bed room $5k for new vinyl

    -Bills are getting paid and on time, no delinquent fees

   -All delinquent Assoc. fee owners are on payment plan

   -Property Agent has keys for all units, continue to monitor

   -Fire Sprinkler alarm and low temp monitoring installed

   -Unit #221 windows replaced

   -Laundry room, repairs completed, annual maintenance scheduled

   -Updated Rules and Regulation doc

   -Tracking Aged Hot Water heaters replacement

   -Propane fixed pricing

   -Managing trash/recycle bin costs

  -Up to date on Income tax

   -Filed taxes $35 dollars, no payment

   -Got very competitive bid on insurance

   -Renters Code of Conduct posted in MOD rentals

  -Annually maintenance tasks waste drain lines snaked, Fire extinguisher and Chimney cleaning scheduled

 

The Numbers:

 

According to the financial reports handed out at the 10/25/2003 Village Annual Owners meeting.

 

As of October 23, 2004

As of end 3rd quarter, need 4th quarter numbers…

 

Profit and Loss Net Income = $33,697 ??

A/R Indicating Delinquent Assoc. Fees = $9,860.48 ??

Balance Sheet indicating Checking Account = $24,000 ??

These actual include the complete set major repairs needed, see maintenance task list for details along with the insurance cost tripling.

 

Proposed 2004/2005 Budget Net Income = $14,630.00 ??

 

As of June 25, 2005

As of end 3rd quarter, need 4th quarter numbers…

 

Profit and Loss Net Income = $33,697 ??

A/R Indicating Delinquent Assoc. Fees = $9,860.48 ??

Balance Sheet indicating Checking Account = $24,000 ??

These actual include the complete set major repairs needed, see maintenance task list for.

 

Proposed 2004/2005 Budget Net Income = $14,630.00 ??

 

 

????????2004/2005 almost cut our operating budget in halve????????


How did we do it:

Complete clean sweep, property agent, contractors, insurance; all new

    -All Cycle trash removal is the only one left

    -Plenty of growing pains

 

Village decision making process

   -Keeping the Owners informed

    -Village news letters and memos

      -Address owners’ wishes and concerns

 

The Village Owners Forum, maintains two lists, included in the newsletters you receive regularly and posted to our Village web site, if your concerns/suggestions are not on these lists it is not being addressed and you need to notify us.

 

Committee Action Items/Owners Forum Open Issues:

A list of concerns, suggestions and solutions from the unit owners

 

Maintenance Task List:

A list of building maintenance task needs for our complexes

 

On a weekly bases the Village Directors discuss these tasks with our Property Agent, Joe Boylan and because of the quantity, available resources and costs of the tasks we:

   -Prioritize the tasks

   -Balance the action with the finances available at the moment

   -Assign actions to board/committee members and/or property agent

 

**The board of directors, at no cost to the Association has taken on much more responsibility than in the past, including:

 

Dan Plimpton --- Village Director

   -Maintains Maintenance Task List

   -Maintenance Task item point person

   -Replacement window inventory

   -Exterior building light inventory

   -Communal Grilling area plan

   -Maintains Bulletin board

 

Dave Parot --- Village Director

   -Bolton Fire District

   -Building/Unit Surveillance

   -Maintenance Task items point person

   -Lawn maintenance point person

   -Snow removal point person

   -Renters Code of Conduct action

   -Propane Fixed Pricing

 

Joe Kareivis – Village Director

   -History of Assoc. and prior maintenance tasks

   -Provided past minutes and budgets

   -What’s worked and what has not

   -Kept us from repeating our past mistakes

   -While insure we continue the success

   -Renters Code of Conduct action

 

 


Kurt Ries – Village Director

   -10/03/03 Created Property agent RFP and solicited 12 potential agents

   - 02/01/04 solicited five local insurance agencies in the area for quotes

   -03/01/04 Worked with legal resources to revise bylaws/declarations

   -Aged Hot Water Heater replacement

   -Removed Water/Sewer for Assoc. assessment

   -Soliciting vinyl siding contractors

   -Maintains Owners forum action items

   -Maintains owners forum website

   -Publishes newsletters

 

Kurt Ries – Village Treasurer

   -Picked up task of acquiring the vinyl siding bank loan

   -Misc. Assoc. maintains tasks

   -Keeps close eye on Village budget

 

Joe Boylan – Village Property Agent

   -Delinquent Assoc. fee success story, right balance of compassion and forcefulness

   -No more late fees on bills like prior management

   -Using competent and owner respected contractors

   -Very receptive to working closely with the board

   -Assoc. management experience has proven invaluable

   -Manage Trash collection costs

 

 Solicit directors to board and committees:

      -Does anyone have interest in being on the board of directors?

      -All director terms are up in 2006

 

Approve Boylan Property Management for another year

   -Contact up for renewal first of year

    -Any other potential candidates?

   -Review and vote on renew Boylan Property Agent contract

   -2006 Management agent increase $50/mon from $6,600 to $7,200 annually

   -Vote on Snow Removal contract, increase of $10 per incident from $55 to $65

 

9:40 – 10:30 Village Treasury update

 Kurt Ries Village Treasure & Joe Boylan Property Agent

   -Review current financial status

   -Review delinquent fees status & success story

   -Review 1.5% interest on 30 day delinquent accounts

   -Review of 2004 budget

   -Review of 2005 proposed budget

   -Review Vinyl siding action plan

 

 


VOTE

 

-Vote on 2005/2006 budget

 

10:30 – 11:30 Review of Revised Rules and Regulation

Kurt Ries Director

   -Review major changes and overall structure

   -Grill ban

   -Common Interest Ownership Act and fines

 

VOTE

 

   -Vote on acceptance of R&R doc.

 

11:30 – 12:00 Review Maintenance and Committee Action Items

Dan Plimpton, Dave Parot Village Directors & Joe Boylan Property Agent

 

Review Maintenance Task List

   Joe Boylan to review

 

Maintenance Task List Review:

            -See attached list

            -Did we miss anything?

-Current big hitters’ vinyl siding, ????

 

Property Insurance Coverage:

To get off this high-risk insurance and lower our premiums, Village will need to be claim free for 3-4 years. We as an Association need to demonstrate due diligence in eliminating as much risk as possible; therefore, the following action plans are in progress:

 

   -Installation of temperature and alarm monitoring equipment in the fire sprinkler room

   -Insulating of building, water supply and drainage pipes to prevent freezing

   -Replacement of old hot water heaters

   -Proposing 'Code of Conduct' contract addendum for renters to abide by

   -Continue to enforce no heating exclusively with firewood

   -Addition of an outside ash disposal can for unit fireplace ash

   -Clearly defined Unit owners responsibility for owner Insurance policy addition to our by-laws

   -Installed electronic/telephone temperature monitoring for part time occupied units

   -Owners check plumbing; including washing machine and dishwasher supply/waste lines

   -Enforce grilling ban and VT fire codes

 

Frozen Pipe Memo:

Memo to go out to unit owners, next heating season, in regards to heating units during extreme cold snaps

   -Mail in November 2004

 


Renters Code of Conduct Document

Kurt and Dave discussed and emailed action plan to Directors 02/19/04

Directors approved the action plan 03/01/04

   -Develop a Village Renters Code of Conduct document to be signed and distributed with MOD

     Rental Pool agreements

   - Insure rental lease for Village unit #326 does not get renewed in April

   -MOD Rental Pool agreements post to our web site 02/19/04

   -Renter in #326 have pretty much violated every by-law and MOD agreement

   -Kurt spoke with Darlene on MOD 02/17/04, she is indicating, only the owner can make decision

     to not renew lease

   -We do not see a timeframe for notification of not renewing lease, but would not let this go to

      long

   -Dave spoke w/ owner Michael Plentus and will contact again specific to not renewing the lease

   -05/03/04 Dave spoke w/ Owner and indicated renters do not have a lease and are staying

   -07/19/04, Owner Michael Plentus looking to sell unit to Renter Tim Gregg

    -09/22/04, Memo went out to MOD and owner

-09/24/04, addendum to declarations complete

-09/31/04 MOD Darlene Wells got back to Joe B.

-Joe K action plan to mount Renters code conduct on MOD rental unit doors

 

 

Owners Forum Open Issues:

The advisory committee is insuring that this level of detail is not lost and is being addressed. We are soliciting for resources to assist in bring the tasks to fruition. Two owners over coffee can complete one task in a few hours verses, two resources performing all the tasks takes weeks.

   -See attached list

 

Why these tasks aren’t complete:

The directors have been buried in Assoc. tasks, many of the lower priority tasks we have not gotten to because of resource and time constraints and we need your cooperation and help on the various committees in motion.

 

 


 Kurt Ries Action Items

 

1.) Complete Village 2005 financial reports

   -Tie up all loose ends and close books on 2004/2005 fiscal year

   -Send Union Bank 2005 financial reports

   -Ongoing as part of loan conditions

  

2.) Following up w/ All Season Vinyl Siding Install

   -Materials on order??

   -Need permission from MOD to park semi trailer

   -Get any est. on additional cost of rot repair

   -03/05 Complete

 

Kurt Spoke with Donna of All Season Siding 01/31/05

   -Siding installation scheduled to begin April 1st, snow depth dependant

   -Donna, getting clarification/cost of siding wing walls

   -03/01/05 Kurt to solicit MOD for permission to park trailer on resort parking lot

   -03/01/05 Kurt to draft memo to all owners to take pictures, nick knacks off walls

   -Kurt to follow up w/ Donna about cream color Alum clad versus white

 

It was discussed that wing walls maybe less costly to vinyl side than to paint. It was also discussed it was recommended by several contactors the Alum clad around windows and eaves should be cream color and not white as on currently on gable end of building A.

 

Kurt is to follow up w/ Donna at All Season Siding and it was stressed that the All Season contract had already be signed and these types of changes are modifications to the agreement.

 

03/08/05 Joe Boylan and Greg Hatin to get together this week at Village Condos

   -Greg to show Joe exactly what is not going to be sided, wing walls in question

   -Joe to show Greg exactly where to park supply trailer in the resort parking lot

   -Joe to show Greg any additional problem/issue areas

 

03/08/05 Kurt and Donna window discussion

   -Donna will quote window installation cost this week

   -Need a 2 wk lead time to order the needed windows

   -All Season can bill owners directly for windows

   -Joe Kareivis window order submitted earlier will be included in the bulk order

   -Window Brand is Simonton, Prism Platinum

   -Cost saving if done at time of vinyl install, because of exterior clad

 

03/08/05 Kurt and Donna siding discussion

   -Kurt confirmed Village is going to go w/ the cream color clad

   -Kurt confirmed Union bank sending $42,832.50 deposit directly to All Season

   -Kurt confirmed nick knack memo went out to owners

   -Donna confirmed that the white clad trim on the gable end with vinyl, will be redone

   -Donna confirmed fascia will be clad-ed on the main building

   -Donna confirmed all clad/siding seams will be caulked

   -Donna confirmed we are on track for vinyl install to begin on 04/04/05 or 04/11/05

 

 

----- Original Message -----

From: Kurt Ries

To: donna hatin ; Joe Boylan

Cc: Dave Parot 124 ; Dan Plimpton 222 ; Joseph Kareivis 325

Sent: Friday, April 22, 2005 4:59 PM

Subject: Fw: Village Siding and Window Project

 

 

Hi Donna another addition to our punchout list

 

1.) There has been a concerned raised with units 222 and 124.

Their old windows, hence the ones that have not been replaced but aluminum clad installed on the exterior window trim, are not opening properly and rubbing/jamming on newly installed clad. Could we be certain to correct on these units and insure other units do not experience the issue.

    -Please keep in mind the window/clad issue are old windows that are not going to  be replaced at this time.

 

2.) Did the slider installations complete in units 228, 227, 323 yesterday 04/21/05

        -Were there any issues, any thing to follow up on?

       -04/25/04 All Season not complete w/ slider, issues with owners doors unlocked

 

3.) Did we get the replacement window measurements on units 321 and 322?

     -04/21/05 all replacement windows measured by All Season

 

Unit getting windows replaced:

228 - 3 Sliders, 1 double pane

124 - 1 single pane

223  - 1 triple pane

227 - 1 slider, 1 single pane

323 - 1 Kitchen, 1 entry, 1 bedroom, 1 living room, 2 sliders

321 - Replace all old, #?

325 - 1 triple pane

327 - single pane

322 - 1 single, 2 double pane

 

4.) When the replacement windows arrive, please advise on what day unit 223 will have its window replaced. owners would like to notify renter.

 

5.) Donna please also recall the trim clad on the previously installed gable end of building needs to be replaced  from our 02/28/05 discussions.

      -ie, calked, j channel and roof sofit completed

 

6.) Donna please proved Time and Material costs for the weeks of 04/08/05, 04/15/05 and 04/22/05

        -04/06/05 Donna mentioned she would email Kurt end of each week with T&M cost to insure Village can cover in our budget

       -Please note I am attempting to split out the cost of the T&M on the unit 221 windows that the owner had removed the trim from

 

Donna stated on 04/22/04 the total for rot contingence on the first building is $748.52; about 2/3 was work on unit missing trim.

 

05/12/05 Rot repair cost - Building B rot $748.23, Building B $376.82 = YTD Total $1,125.05

 

7.) The vinyl crew is doing a good job on cleaning up our site each day

      -We are getting some concerns from near by residents of debris blowing down the hill

     -Maybe unavoidable, but any the crew could do to mitigate the issue would be greatly appreciated

 

8.) Outside unit 222 second floor deck, propane supply line not secure and is missing a clamp

       -Pls insure this and other unit supply lines are secure

 

9.) #221 missing deck exterior light

      -Renter asked siding workers and they did not know

 

4.) Work with Joe B to follow up Rental MOD

   -Kurt needs all memos that were sent to Darlene

   -Need to insure we document all action taken

   -Post rules and regulations on inside of each rental unit

 

It was agreed to post Rules and Regulation Doc on the inside of each unit door that is in the MOD rental pool.

   -05/01/05 Kurt to reduce MOD/Village R&R to one page

   -05/01/05 Joe K to notify MOD of the policy

   -05/01/05 Joe K to draft memo to all owners in rental pool of policy

   -06/01/05 Joe B to mount R&R on doors

 

5.) Update Village Web Site

      -Ongoing as part of loan conditions and bylaws

 

6.) 04/30/05 Reserve room for Village 2005 Annual Meeting

       -Saturday June 25, 2005 at 9am

      -Location: Bolton Valley Lodge, Champlain Room, Bolton Valley, Vermont

       -04/25/05, reservation confirmed BV Resort

 

James J. Fix

Director of Sales

Bolton Valley Resort

802-434-6813 Direct

 


7.) 03/08/05 Union Bank Loan

The loan amount is $43,438.00, so following this $42,832.50 advance there will be $605.50 available for disbursement anytime prior to 10/1/05, when the line of credit portion of the loan will be closed.  Now that funds have been advanced from the loan there will be an interest payment due 4/1/05 and on the first day of each successive month until the monthly principal and interest payments begin 10/1/05.

 

   -Rot contingence and exterior painting

 

 

8.) 02/24/05 Ayer Action Plan Non-conform Exterior Door

 

Action plan Terse Ayer Door

   1.) Find in Bylaws/R&R common look and feel statements

   2.) Find / document discussions with owner on replacing windows themselves

       -I believe we discussed common look and feel on the windows

  3.) Write memo to loge formal complaint backed up w/ bylaws statements

         -Do not screw up owner’s willingness to replace windows

 

02/24/05 Steps 1-3 are complete, pls see attached memo that was postal mailed to Ayers today, in addition I have an voice mail out to her to call me.

 

   4.) Have Joe B follow up

          -Be prepared for the push back

          -03/17/05 Joe B followed up, met with Pat at business, no way no how

    5.) Once we have proper documentation in place we can follow up with legal resources if necessary

   -Brice sent certified letter 04/25/05

 

Folks, we are a nonprofit corporation guided by our Bylaws, Declarations and Rules and Regulations. Whether we are dealing with friend, psychopath or the devil herself we have an obligation as owner elected directors to abide by these constrains as best we can.

 

For a legal resource to take any effective action a document trail needs to exist

   1.) Has the offender been officially notified of the offense

   2.) What action has the Assoc. taken

   3.) What was the owner’s action/response

 

To insure we do not get in the situation that we were in w/ MOD, our property agent takes direction from the board. The board needs to agree on a action plan in these type of delicate situations in accordance with our bylaws and best judgment along with insuring the task is followed through to fruition. Please note Joe B is involved once the plan is set in motion by the board. I have added the contingence for legal assistance to the action plan in step 5, but calling a lawyer first without notify the owner is not the proper approach to be effective nor is it compliant with our bylaws.

 

9.) Ayers Insurance Claim

 Per our conversation on 02/18/05 you requested background information on the Village Assoc. insurance claim Arcadia #4033174 opened on 12/17/03 caused from the repair of the Village Condominium frozen sprinkler system. 

 

---- Forwarded by Kurt Ries/Burlington/IBM on 04/26/2005 12:14 PM -----

            Claire.Mullaney@acadia-ins.com

            03/31/2005 02:47 PM    

                         To: Kurt Ries/Burlington/IBM@IBMUS

                         cc:

                         Subject: Village Condominium frozen sprinkler loss of 12/9/03

 

 

Today, I received some repair estimates from a unit owner who claims that

his unit was damaged as a result of the sprinkler freeze up.  At that time,

we inspected units 123 and 126 and found that they had suffered minimal

damage for which we paid $360 and $130, respectively.  Pat Ayer, the owner

of unit # 221 is now claiming damages of $2,575.00.  Could you please

contact me at your earliest convenience to discuss this new claim?

Thank you,

 

   -03/31/05, discussed situation with Clair, explained repairs are probably complete

    - The other claims unit 126 and 123 were less than $500

   -Clair is going to send adjuster to unit

   -Clair to work w/ owner not Assoc.

    -Claim check if any will be mailed to Joe B.

 

10.) Rules and Regulation Update

To change these type of behavioral issues we are probably going to need to amend R&R doc stating the Common Interest Ownership act section 27A 3-102 A11.

   -Define process of an owners hearing with the board

   -Define owner appeal and board decision process

   -Guidelines for assessing fines until compliant, ie $100 a day

   -05/25/05 Kurt submitted a draft, Brice to add legal ease

 

 


 

Dan Plimpton Action Items

 

1.) Contact Dana Clark

   -Dana has wrapped up most of his tasks, but get knowledge xfer on his activities

   -Not assigning treasure responsibility, just need you to pick up any outstanding tasks

   -Dana has given #227 unit key back to Kurt

   -Dan to contact Dana by 03/01/05

 

2.) Window Inventory

   -Document unit number and windows not replaced, complete

   -Memo to needed owners on replacing windows

   -Joe B to follow up after memo

   -Get units on contractor’s All Season schedule for bulk replacement

   -May need to follow up with legal resource to enforce on must replace windows

   -Need to done before vinyl install starts in 04/05

   -03/14/05 Complete Inventory

  -Clarify mandatory window replacement statement

  -Assoc. not paying for All Season to return and replace aluminum clad on window replaced after the Owners will be billed.

 

Snippet from 10/26/2002 Village Association annual meeting minutes

   “2 windows per year are being installed in each condo…”

   “2 more windows per unit (the 2 worst) will be installed next year”

 

There is no ‘may’ in these statements, this would imply mandatory.

All windows can be installed at once but must install 2 a year until complete.

These statements also imply that all unit Owners windows are to be replaced and that the mandatory window replacement is not complete.

 

It was discussed there is some urgency in that these tasks needs to be completed before vinyl siding installation begins around 04/05. It was also discussed that All Season’s can replace windows after the vinyl siding, but it is to our advantage to replace before.

 

Dan to have window inventory complete by 03/01/05. Dan to incorporate other owners/directors as necessary to complete the task ASAP.

   -02/28/05, Dan completed window inventory

   -02/28/05 Kurt to discuss w/ All Season a bulk window installation date and cost

 

3.) Security Lights Inventory

   -Building A, access Rd halve working intermittently

   -Many bulbs out

   -Ramp end light globes off from wind

   -Work with Joe B and Shannon Parot 802-434-5597

   -Get on contractors schedule

   -Continue to monitor

 

Dan picking up this ongoing task, first inventory to be completed by 03/14/05. It was discussed that because Joe B our property agent does his building surveillance during day light hours, non functional lights can be missed.

 

 

 

4.) Communal Grilling Area Plan

Preliminary Communal Grill Area Action Plan

Cost to construct, how elaborate

Cost to maintain

Allocate cost in Assoc. budget

Location, between buildings

Approval from owners adjacent to the area

Hours of operation

Enforce hours of operation

Propane and/or charcoal

Lawn chairs and grilling paraphernalia

Waste container

Who will police the area

How does the Assoc. address complaints

Noise ordinance

Fire hazard, fire extinguishers

Comply w/ VT fire codes

 

5.) Laundry Room Bulletin Board

   -Part of renter action plan and bylaws to publicly post

   -Really should post some other items of interest also

   -Remove outdated posting

   -01/20/05 Kurt emailed docs to Dave and Alica

   -01/31/05 Dave will post Village Rules and Reg doc

   -04/15/05 Kurt posted R&R doc

   -Darlene indicated she might be interested in taking over this task

   -Need Vermont fire codes posted

   -Need notice of annual meeting posted

    -Water report?
Joe K Action Items:

 

 

1.) Fire PrePlan Task

   -07/19/04, Joe B pick up the Fire PrePlan Task

 

Action Plan - Village Emergency Procedures

The main item we are after is a fire preplan for our buildings with fire department, needs to be discussed with the fire department. The Fire PrePlan would really have nothing to do with the resort, every communal, public building should have plan filed with the fire department with Assoc. contacts, building layout, explosives/flammable storage, water shut off, elect shut off etc.  Tasks change as we get details and can make more informed decisions, if action plan needs to be modified or tasks should be dropped or added please let me know.

 

Advisory Committee compiled contact list of owners and utility phone numbers.

       -09/25/03 Kurt Complete

      -01/09/05 Kurt updated, mailed to owners and published to Village web site

 

Issue:

   -Building needs a fire pre-plan

   -Bolton Fire Department Fire Station, 802-434-3968

   -Bolton Fire Warden, 802-434-3892

   -Evacuation procedure

   -Village Condo Building A/B Layout diagrams, ie floor plan

   -Cannot get stretchers down stair well ramps

 

Proposed Action:

   -Check procedures for the various Bolton Associations

   -Discuss with local fire department and utilities companies

   -Work is completed on the installation of sprinkler monitoring equipment

 

Status:

02/06/05 The Fire warden had told Joe K that he would be contacting each association on the Mountain individually concerning both the evacuation and accessibility of the units.

   -02/16/05 Joe K contacting fire warden to make himself primary contact

 

2.) Fire warden to enforce grill ban

      -Joe K to contact fire warden and/or fire dept to see about how to enforce

      -Need to compile a list of grills remaining on decks

      -Do we want to do this??

 

The directors are currently discussing how to address the issue and exploring the option of compiling a list of the offenders and turning over to the Bolton fire warden as in violation of Vermont Fire Codes, NFPA 1 3-4.7 and NFPA 1 30-3.3.8.

 

 

3.) Work with Joe B to follow up Rental MOD

   -Kurt needs all memos that were sent to Darlene

   -Need to insure we document all action taken

   -Post rules and regulations on inside of each rental unit

 

It was agreed at the 01/31/05 directors meeting to post Rules and Regulation Doc on the inside of each unit door that is in the MOD rental pool.

   -05/01/05 Kurt to reduce MOD/Village R&R to one page

   -05/01/05 Joe K to notify MOD of the policy

   -05/01/05 Joe K to draft memo to all owners in rental pool of policy

   -06/01/05 Joe B to mount R&R on doors

 

Status:

02/01/05 Kurt completed draft of  R&R to one page and solicited for Director input

Draft R&R is posted to village website under the Bylaws and Declaration section

    -Rental Pool Rules & Regulations

 

This document is slightly modified from the Bolton Valley Resort Lease and Security Deposit Agreement'; should mean no change to owner's rental agreement and business as usual for MOD. The MOD Rental Pool agreements can also be found on the Village web site, under the contracts and agreement section.

    -Rental Pool Exclusive Right

    -Rental Pool Lease

 

   -02/02/05 Dan commented he likes the plan and approved R&R one page doc

   -02/09/05 Dave approved R&R one page doc

   -02/09/05 Dave and Kurt discussed adding a statement about abiding by all Village Bylaws

   -02/28/05 Joe K contacted MOD about R&R doc on Rental Pool doors

   -02/28/05 Joe K drafting memo notifying owners in the MOD rental pool of the R&R doc on door

   -03/02/05 Joe K drafted memo for Kurt to place in Village standard memo template

   -03/02/05 Joe K to solicit  from MOD all units currently  in the rental pool

 

Joe K did you get a chance to review and approve/comment on the Rental Pool R&R to be hung on the door?

   -Dave and Dan have approved, but thinking we should have a clause of abiding to Village Bylaws.

 

Joe as part of your discussion with Darlene of MOD rental pool, you will need to obtain all the Village units currently in the rental pool.

Per our Village contact list we have the following units listed as being in the MOD rental pool, however I suspect this is no longer current.

   -323, 324, 325, 326

 

Once Joe K finds out which units are currently in the Rental Pool, we can have Joe B send memo to the appropriate owners.

 

joe k <silver_fox@comcast.net>

03/02/2005 05:55 PM    

To: Kurt Ries/Burlington/IBM@IBMUS

cc:

Subject: Village " Rules and Regulations"

 

 

Kurt

 

The folowing is a draft of a memo to be sent to owners who rent their units:

At a resent meeting of the Village Condominium Association Directors, the need to inform renters

of the rules and regulations governing their conduct was discussed.

 

The placement of a copy of the Rules and Regulations on the inside of the front door

of rental units was approved. Our property manager, Joe Boylan, will install

a receptacle to retain the information. If you have any questions relative to this matter please contact me as soon as possible at 973-379-4085.

 

                       Joe Kareivis

 

                       Village Director

 

 

 

Kurt

 

Review this proposed memo and make

any changes you want. If you want me to send this

letter to the affected owners please give me

a list of the units.

 

                       Joe K.


Dave Parot Action Items

 

1.) Memo to owners to check their unit’s:

   -Water/drain fixtures

   -Laundry machine supply lines

   -Dishwasher supply lines

   -Garbage disposal

   -Hot water heaters age

   -If necessary Property agent to assist in effort

   -Part of insurance claim action plan

   -10/28/04, Dave picked up the task, for mailing early next year, 2005

   -Dave to have draft 02/07/05, Kurt and Joe B to assist

 

2.) Electric Laundry dryers must be vented to outside

 

Issues:

            -dryers not vented to outside create moisture and mold

            -Dryer not vented to outside create needed moisture and heat in winter months

           

It was discussed that if the Assoc. does attempt to enforcing venting to outside it will be issue with owners as most unit dryer installation do not have access to outside wall.

 

It was agreed that our property agent Joe Boylan will inspect the washer/dryer installations during the annual chimney/fire extinguishers maintenance and any issue with supply lines, drain or venting will be dealt with on a individual unit basis.

 

   -03/10/05, Joe B found no mold/mildew issues, unit all freshly painted

 

3.) Grade Parking lot

   -Action plan of 3 part fix, Retaining wall, parking lot drainage, ramp footing

   -Get estimate/bid

   -Get on contractors schedule for this summer

 

Dave spoke to Todd Fourier of QT Landscaping with a gross est of $2k. Probably will not be able to obtain actual bids until spring.  Dave and Joe B to obtain gross est bids from contactors QT Landscaping, Gene Armstrong & Bruce Womer. It was discussed that it is a concern not to be on contractor schedule before spring.

 

4.) Snow Removal Review

   -No major complaints to date

   -Dave will follow up with Todd in the spring to repair any plow damage

   -Dave and Joe B discussed with Todd about keeping path open to propane tanks

   -Need 2005/2006 snow contract for approval at annual meeting


 

Joe Boylan Action Items

 

1.) Joe B to update Village spreadsheet finical info for previous quarters to align w/ new fiscal year

       -Q1 July/Aug/Sep, Q2 Oct/Nov/Dec, Q3 Jan/Feb/March, Q4 April/May/June    

 

Need 2004/2005 completed Village financial spreadsheet by 05/06/05 to complete budget for 05/17/05 Directors meeting

 

2.) Delinquent Assoc. fee status

    -Need Action plan

   -Leans, legal resource

 

Unit owner #226 not paying agreed upon payment plan since 10/04

   -01/31/04 Joe B and Kurt met w/ #226 owner

   -Collected 2 months of payment plan

   -Obtained signed agreement of same payment plan but paying off a month later

   06/02/05, Owner paid up !!

 

3.) Review of maintenance procedures for Property Agent and Directors

    -Need to insure approved tasks status is updated

   -Need to insure we are using incident report forms

   -Need to insure that two director approve all cost over $1,000

 

4.) Ash can missing lid

   -Was tied down?

   -Joe B will be replaced ASAP

   -No longer stacked down

   -Need to move away from trash building

   -Obtain metal pole?

 

5.) Kurt and Joe B discussed Bill Guyette will be out the week of 10/25/04 to complete misc task including:

   -Replace exterior light fixture Building B, 1st ramp

   -10/24/04, Joe picked up fixture, Bill to replace 10/25/04

   -10/21/04 Flower box by #327 ready to fall off rail, complete

   -03/15/05 Fix loose rail by #327, complete

 

6.) Kurt and Joe B discussed building B retaining wall and tower repair to start week of 10/04/04

   -10/01/04 The board has approved the $4k bid to replace retaining wall and tower repair

   -Board is aware that this does not include the flower rock wall

   -The board based approval on this is a not to exceed cost

   -10/04/05, received hard copy of $4k bid from Barber Farm, Inc.

   -Getting several complaints about the unsafe and eye sore conditions, we need to get this completed ASAP

   -10/05/04, Joe and Kurt discussed Joe B to check with contractor about the repair of the tower, not indicated in bid

   -10/05/04 Contractor mentioned could not start until November

   -10/05 Joe B and Kurt discussed, important to get on contract schedule ASAP

   -10/05/04 Joe B to discuss with Bruce why the delay and can we start earlier

   -10/11/04 Joe B and Kurt discussed

      -Joe B tried, but not going to start project until early Nov 2004

      -Joe B did confirm we are on Barber Farm schedule for early Nov.

      -Joe B to verify drainage pipe is included in bid

      -Joe B to verify aggregate stone below the retaining wall and ramp support tower

      -Joe B to get bid/est. on the inclusion of flower stone wall area

      -10/23/04 Joe B mentioned construction may start as early as this week of 10/25/04

      -11/08/04, contractor appears to be done, with the following issues

      -Did not add timbers above ground for safety barrier

      -Did not fill sink hole above retaining wall and by ramp very well

      -Did not lay down aggregate drainage rock by ramp tower and retaining wall

 

01/31/05, It was discussed the retaining wall is well build by a experienced contractor and may need additional fill at top of wall in the spring. Additional fill will be evaluated along with the parking lot grading.

   -06/04/06 Contractor returning to look at bow in wall, tie back may have slipped

 

7.) Building B 2nd Ramp Stairwell Tower Footing:

      -Joe B did verify the stairwell tower is not included in the retaining wall bid

      -Joe B and Bruce going up to look at/repair stairwell tower, 10/15/04

      -10/23/04 Joe B mentioned repair may start as early as this week of 10/25/04

 

01/31/05 It was discussed Joe B and Bruce Womer looked at and Joe B will insure to get on Bruce’s schedule end of April 2005.

 

8.) Building B 2nd Ramp Footing

   -Working with maintenance cost est., BV quoting $9k

   -Evaluating cost of fixing root cause, repairing water drainage issue with retaining wall and parking lot

   -Mark Cross completed floating support of building B ramp week of 10/20/03.

         -Disconnect ramp from retaining wall, add temp support, dig fill w/ insulation retaining wall.

         -May have crushed exterior siding or worse on building.

   -06/07/04 Ramp temporary supports sinking, we now have a safety issue and needs to be addressed ASAP

   -06/17/04, Bruce Womer, taking a look at, maybe able to do rock, retaining wall, and ramp

   -07/13/04, Bruce took a look at, gross est $2,500, start job on 07/26/04

   -Contractor felt footing has sunk about as far as it will go

   -07/13/04 Contractor mentioned floating support is fine

 

01/31/05, I was agreed not to purse replacing the ramp tower footing at this time and we should continue to monitor the other ramps to insure they are not pushing into the buildings.

 

9.) Paint ramps, towers, balcony walls

   -Chimneys??

    -Get bid from George Goulet 802-658-1715

    -All inclusive verbal Goulet bid of $19k, $40K for the entire complex

   -Get on contractors schedule for this summer

   -Need to decide on color

   -Are we painting inside walls of ramp??

   -Not painting ramps walk surface??

   -Vinyl side/paint chimneys, along w/ repair

   -Bill Guyette submitting bid

   -Current brown portions of rail top caps and tower rails remain brown

 

It was discussed the Goulet bid is far too high and Joe B, has contacted a couple of general contractors to paint for around $5k including materials. Joe B to pursue written bin and schedule work with contractors.

 

01/31/05, It was agreed to paint un-sided portions of the building same color as siding. Kurt spoke w/ Donna at All Season siding and she is providing a sample of the ivy siding to assist in matching the paint.

 

10.) Ramp foot surface

   -Non-skid surface possible??

    -Plastic porch material??

    -Scrape/Replace??

   -Need documented cost est on options

   -Get on contractors schedule for this summer

 

01/31/05, Continues to be a healthy but hotly debated subject. It was agreed to wait on doing anything with the ramp walk surfaces until this fall when the siding and painting projects are complete, and then evaluate if we have the funds and can obtain a contractor to pursue.

 

11.) Ramp support bracket rust stains

   -Some stains from footer nails

   -Replace ones by building??

   -Be a shame to stain new vinyl

   -Need est/bid

   -Get on contractors schedule for this summer

 

01/31/05, It was discussed that Joe B will include provisions in the painting bid to caulk/seal the problem areas.

 

12.) Flower Boxes

   -Remove

  -If keeping, need budget line item for maintenance cost

   -Get on contractors schedule for this summer

   -Bldg B 2nd Ramp rail is loose

   -Complete

 

01/31/05, It was discussed that Joe B and Bill will remove and dispose of flower boxes before siding begins. Sometime in the future, new plastic flower box and maintenance cost will be evaluated.

 

13.) No Parking sign

   -At entrance of Village Parking lot

   -Do we need, have not seen an issue?

 

01/31/05, It was discussed that Joe B has obtained a sign for less than $20 and will mount at the entrance to the Village parking lot.

 

14.) Electrical cable from shed

   -Remnant left from removal of shed

   -Under Building B 2nd ramp

 

01/31/05, Joe B will take care ASAP.

 

15.) Unit door #228 McKenna found open three times now

   -Owner needs to slam to get to latch

   -Get on contractors schedule

   -Who is going to pay for repair

 

01/31/05, Joe B will make arrangements to do the minor repairs to fix.

   -Complete

 

16.) 2004 tax preparation

   -Joe B to do

   -Want to avoid using Tom Lauzon

   -02/12/05 complete, $35

   -Did not have to pay in and get back refund

 

01/31/05, It was agreed that Joe B will do our taxes this year. Joe also does taxes for his other associations.

 

17.) Renters Code of Conduct Action Plan History

Kurt and Dave discussed and emailed action plan to Directors 02/19/04

Directors approved the action plan 03/01/04

   -Develop a Village Renters Code of Conduct document to be signed and distributed with MOD

     Rental Pool agreements

   - Insure rental lease for Village unit #326 does not get renewed in April

   -MOD Rental Pool agreements post to our web site 02/19/04

   -Renter in #326 have pretty much violated every by-law and MOD agreement

   -Kurt spoke with Darlene on MOD 02/17/04, she is indicating, only the owner can make decision

     to not renew lease

   -02/17/04 No timeframe for notification of not renewing lease, but would not let this go to long

   -Dave spoke w/ owner Michael Plentus and will contact again specific to not renewing the lease

   -05/03/04 Dave spoke w/ Owner and indicated renters do not have a lease and are staying

   -07/19/04, Owner Michael Plentus looking to sell unit to Renter Tim Gregg

    -09/22/04, Memo went out to MOD and owner

   -09/24/04, addendum to declarations complete

   -09/31/04 MOD Darlene Wells got back to Joe B. with promise to address

   -09/31/04 Joe B mentioned Darlene to get back to him w/ status and last two leases

   -09/31/04 MOD needs to reply to memo in writing, Assoc. needs document on what was done

   -09/31/04 Joe B and Kurt discussed Darlene is very bad at following through and Joe B

will need to stay on top of it

   -10/03/04 TV gone, but trash still on balcony

   -10/11/04, Joe B and Kurt discussed will wait until 10/13/04 for MOD to get back to Joe B

   -10/16/04  Trash removed from balcony

   -10/25/04 No additional word from Darlene Wells of MOD

   -10/25/04, Kurt and Joe B to compose another letter to owner and MOD

   -11/01/04 Joe B sent additional letter to MOD week

   -12/14/04 No additional word from Darlene Wells of MOD

   -07/26/04 Chimney inspection ~1/2 cord of wood in unit #326

   -12/02/04 Low Temp installation, No wood in unit #326

   -12/14/04 Smoke could be coming from new Tenant in #126

   -12/15/04 Joe B going to inspect both units #326 and #126

   -12/15/04 Joe B spoke to the Tenant in #326 in person and with MOD's Darlene Wells.

         -Unit #326 had woodstove going and firewood stacked in the entry

          -Only one of the 3 chimneys stacks had smoke

         -Tenant denied allegations of heating primarily w/ firewood

         -Joe B also spoke to MOD's Darlene Wells, Darlene mentioned:

                -She will discuss w/ tenant

                -Darlene also mentioned she believes the tenants are moving out

   -12/16/04 Joe B sent memo to MOD Darlene Wells and Owner Michael Plentus

          -If we do not hear from MOD, Joe will follow up before 12/29/04

 

01/31/05, It was discussed that MOD is being compliant with our requests, just not good about getting back to us. It was agreed that the issues appear to have been addressed and we will continue to monitor and not to pursue further at this time.

 

 

15.) Sprinkler System inspection

   -Next inspection due 03/06

   -Get on contractors schedule

   -Complete, need costs of repair and inspection for budget

 

It was discussed that Joe B to follow up with Sykes on:

   -2nd phone line alarm went off and Joe B was not alerted

   -Probably Unit #224 disconnected phone

   -Need to insure alarm/notification process is working

   -Do we need dedicated phone lines, would be nice to avoid

   -One service call would about pay a year’s phone bill

   -Sprinkler inspection

   -Need quieter compressor

 

18.) Annual Building Inspections

   -Need to insure all Unit low temp sensors are in working order

   -Fire Extinguishers

   -Chimney Cleaning

   -Smoke Detectors

      ~45 batteries

   -Annual inspection will be scheduled for July 2005

   -Maintenance must be scheduled with unit owners

 

19.) 2006 Property Agent Renewal Contract

   -Need to approve at the 2005 Owners meeting

   -Need to approve snow removal contract

 

20.) Mount thermostat in laundry room

 

21.) Secure propane line to laundry room

 

22.) Need contact info for new owner in Unit 224

 

23.) Building B rock wall fell apart

 

 

 


Misc. Brain Droppings

 

03/07/05 Village Condo Owners-

As spring quickly approaches along with the completion of vinyl siding project, in a continuing effort to keep owners informed, we are soliciting your comments on initiatives the board is currently discussing. For additional detail on these and other initiatives please see  the Village Assoc, 01/31/05 Directors Meeting Minutes on our Village Assoc. Web site at the following link:

 

http://users.adelphia.net/~kries/

   -Password is 'garth'

 

Please find below three Assoc. discussion topics we are soliciting your input.

 

 

1.) Village condo master insurance policy renewal and banning all grills from decks

 

Our Assoc. master insurance policy is up for renewal on 03/15/05, our Association, Property Agent and Insurance Agent have been working diligently to insure we obtain the most cost effective policy possible. On 02/22/05 loss control inspectors from the various insurance companies inspected our buildings, and were  impressed with the initiatives Village has completed to prevent insurance claims. In particular, fire sprinkler monitoring service, unit low temp sensors, annual unit fireplace/stove and chimney cleaning, fireplace/stove ash can disposal, annual fire extinguishers inspections and clearly defining owner/Assoc. responsibilities. However...

 

The Assoc. can save $5,000 to $7,000 of your dollars, if we modify and enforce our Rules and Regulations document to reflect no grills of any kind,  on any of the complex's decks.

 

Our current Village Rules and Regulation document is compliant with the State of Vermont fire codes, including NFPA 1 3-4.7 and NFPA 1 30-3.3.8.2

Please see the following link to the VT state fire prevention site for more detail.

 

   http://www.state.vt.us/labind/Fire/infogrills.pdf

 

Our currently Association Rules and Regulations states the following based on the states' fire codes.

 

Snippet for Village R&R doc:

2. No owner shall engage in or permit any conduct or use, or maintain any device in or adjacent to any unit which will increase the risk to others or the cost of fire insurance, including

a. The use of charcoal grills is expressly prohibited on balconies, wood patios or in common areas. Owners should recognize that, according to Vermont Fire Code, NFPA 1 30-3.8.2, in public buildings all types of barbecue grills are subject to regulation as to size and usage.

 

Comments from our Insurance Agent:

During the past two years we have seen two serious fires (one was my next door neighbor) occur when gas grill caught fire while being used on a ground level deck,  (just in our agency).  In each case the homeowner was unable to stop the fire or move the grill and the resulting damage to the deck and rear of the house was significant.   We have seen all the companies we represent take some pretty aggressive stances towards loss control, with margins shrinking there is a clear direction to aggressively minimize losses.  The grills are an issue that isn't going away.

 

We realize many of our owners have several hundred dollars in propane grills, and if we adopt this policy, all grills will need to be removed from the decks. Insurance cost does not effect the Village budget, only your wallet,  and as discussed at our 10/25/04 annual meeting all Assoc. Insurance costs whether they increased or decreased will be directly passed on to owners and is not considered a change to Assoc. fees.

 

The directors are discussing creating a communal grilling area next to the building with landscaping and picnic tables along with the possibility of a barbecue grill maintained and funded by the Assoc. for owners to utilize. We probably do not have the money in this years' budget to fund, however we can probably work into the budget for next year and we will add the matter to our Annual Owners Assoc. meeting on Saturday June 25, 2005 at 9 am agenda.

 

Please advise before 03/11/05 if you have any comments or concerns; if one does the math $7k divided by 21 = avg cost to unit owner and for the additional fire safety, I think you will agree that we should probably ban all grilling from the decks of units and create an area away from the buildings for picnicking and communal grilling area.

 

***Vote on permanent change to R&R

The following is a snippet of the change from the attached revised Village Rules and Regulations document:

 

2. No owner shall engage in or permit any conduct or use, or maintain any device in or adjacent to any unit which will increase the risk to others or the cost of fire insurance, including

 

a. The use and the storage of charcoal and propane grills are expressly prohibited on balconies, wood patios or in common areas.  Barbecue grills can only be used in designated grilling areas approved by the Village Association board of directors. Owners should recognize that in accordance to Vermont Fire Codes, NFPA 1 3-4.7 and NFPA 1 30-3.3.8.2, all types of barbecue grills and their storage in and around public buildings are subject to regulation as to size and usage.

 

 

2.) Completion of our vinyl siding project will start beginning of April 2005 along with the associated exterior painting

Pls be certain to remove any pictures or nick knacks that may fall and break from the vibration of the installation. We are making a change to the color of the aluminum clad trim that will be installed around the windows and eaves. From recommendations by All Season our vinyl siding contractor and our exterior painters contractors the board is discussing changing the aluminum clad trim from white  to a cream color.

 

Please advise before 03/11/05 if you have any comments or concerns

 

 

3.) Push to get old unit windows installed before vinyl siding install begins

Most units still have old windows to be replaced at owners cost, you will be receiving a memo in the postal mail shortly with specifics on  windows in your unit that need to be replace before the vinyl siding installation begins. For your convenience the Assoc. is coordinating a bulk order and window replacement, at a reduced negotiate price point with our contractor All Season Siding and need to include your units windows in the order.

 

Snippet about mandatory window replacement from 10/26/2002 Village Association annual meeting minutes

   “2 windows per year are being installed in each condo…”

   “2 more windows per unit (the 2 worst) will be installed next year”

 

Please advise as soon as possible to insure we can include your units windows in the bulk window order and replacement. Be a real shame to have new vinyl siding and rotted deteriorated windows remaining in our complexes.

 

 

Please do not hesitate to contact me with any questions or concerns,

   -Kurt

 

**Assoc. not paying for All Season to return and replace Aluminum clad on window replaced after the Owners will be billed.