Village Condominium Association at Bolton Valley,  Inc.

 


Village Condominium Association Annual Report

2010 Annual Meeting Minutes


Table of Contents.............................................................................................................................................. 1

Attendance................................................................................................................................................................ 2

Village Association Business................................................................................................................... 3

Approved the acceptance of 2009 Village Annual Meeting Minutes...................... 3

Next Village Annual Meeting................................................................................................................. 3

Solicit Directors to Board and Owners Committees:...................................................... 3

Property Agent Contract Renewed................................................................................................. 4

Snow Removal Contract Renewal.................................................................................................... 5

Lawn Care Contract..................................................................................................................................... 7

Property Insurance Coverage:............................................................................................................ 7

Regularly Scheduled Owners Memos to Proactively Address Reoccurring Issues:               10

Before We Address Concerns, Lets Talk Successes....................................................... 10

The Numbers:...................................................................................................................................................... 11

Owner committees needed to reduce Assoc. operating cost:................................ 11

Village Assoc. Web Site and Owners Forum:.............................................................................. 13

Village Mission Statement...................................................................................................................... 13

Village decision making process...................................................................................................... 13

Roles and Responsibilities.................................................................................................................... 14

Village Treasure Update............................................................................................................................ 16

2010 / 2011 Village Budget......................................................................................................................... 16

Special Assessments and Raising Assoc. Fees...................................................................... 16

Vinyl Siding Contingence Plan............................................................................................................. 16

Village Bylaws, Declaration Amendments and Rules & Regulations.................... 21

Grills are expressly prohibited:.................................................................................................... 22

Inappropriate Use of Trash and Recycling Sheds:............................................................ 22

Owners need board approval to modify common areas or exterior of building:      23

The Board of Directors are empowered to impose reasonable fines.............. 23

Pet Issues and Concerns:........................................................................................................................ 23

Village Maintenance Updates................................................................................................................. 26

Major 2010/2011 Maintenance Projects:........................................................................................ 26

Village Condominium Replacement Projects............................................................................. 31

Unit Window Replacement Project:................................................................................................ 31

Windows to be replaced......................................................................................................................... 33

Hot Water Heater Aging Report........................................................................................................ 36

Village Owners Forum Open Issues List........................................................................................ 37

Bolton Valley Updates................................................................................................................................ 42

State of the Mountain Update............................................................................................................ 42

Potable Water Initiatives Update.................................................................................................... 44

Bolton Valley Fire District Update............................................................................................... 45

Bolton Valley Presidents Council Update.............................................................................. 48

Appendix A – Village Financial Statements................................................................................. 50

Village Association Annual Meeting Minutes

Date: June 26, 2010

Time: 9 AM ET

Location: Bolton Valley Lodge, Bryant Room, Bolton Valley, Vermont

Chair Person's: Kurt Ries, Village Director

                          David Parot, Village Director

                      Mike Nielsen, Village Director

    Joseph Kareivis, Village Director

    Mike Brigham, Village Director

    Colleen Malloy, Village Director

   Jason Williams, Village Director

                

Please note the following information is presented by subject matter and not in chronological order.

 

Unit#

Owner

% of Vote

Status

123

Steven McLeod

5.94

Proxy

124

David Parot, Alicia Apgar

4.01

Present

125

Scott Hempey  

4.01

Proxy

126

Darlene Autery

5.94

Present

127

Heidi Hale

3.3

Not Represented

221

Terese Ayer

6.83

Not Represented

222

Colleen Malloy

6.83

Present

223

Erin Ladeau

5.94

Not Represented

224

Steve Silberg

4.01

Not Represented

225

Michael & Noranne Nielsen

4.01

Present

226

William Donahue

5.94

Not Represented

227

Kurt Ries

3.3

Present

228

Mike McKenna

6.83

Proxy

321

Ernest Levesque III

3.3

Present

322

Alan Pierce & Jamison Ervin

3.3

Not Represented

323

John & Emily Johl

5.94

Proxy

324

Phillip & Deborah Angier

4.01

Present

325

Joseph Kareivis

4.01

Present

326

Anthony Foti

5.94

Proxy

327

Jason & Kiersten Williams

3.3

Present

328

Mike Brigham

3.3

Present

 

Per by-laws, a quorum is established by the “majority of owners” present, defined by twenty five percent (25%) of the votes present or represented by proxy in accordance with the percentages assigned in the Village declaration.

·         Quorum established at 67.37 %


 

 


Chapter

2

Kurt Ries, Village Director

 

Approved the acceptance of 2009 Village Annual Meeting Minutes

  • Minutes were approved

 

Next Village Annual Meeting

Next year's 2010 meeting is scheduled for the last Saturday of June.

 

  • June 25th, 2011 9:00 AM ET

 

Solicit Directors to Board and Owners Committees:

The following Board Members were unanimously approved to the board by the owners:

Colleen Mallory    - Elected 06/26/10

Jason Williams     - Elected 06/26/10

 

Remaining Board Members Terms:

Kurt Ries              – Renewed 06/27/09

Dave Parot            – Renewed 06/27/09

Mike Nielsen         – Renewed 06/27/09

Michael Brigham   --Renewed 06/27/09

Joe Kareivis          – Renewed 06/27/09

 

Anyone interested being on the board of directors or any of the much needed owners committees, please contact Kurt Ries. The difference between a director and a committee members is the commitment of your volunteer time and the duration of your responsibilities.

 

Director responsibility:

Directors terms are a two year commitment and directors are assigned weekly actions to complete that will require around four to five hours week.

 

Committee responsibility:

Committees are short term projects and commitment is finished once the individual task is completed.

 

  • There was no additional owner interest in board or committee positions

 

Property Agent Contract Renewed

Boylan Property Management Village Property Agent 2011 contract was discussed

 

  • Boylan Property Management 2011 contract approved by owners

 

Boylan Property Management contract goes 01/01/11 through 12/31/11 contract cost will be $7,800 annually; no cost increase over previous year, Property Agent contract has been posted to the Village Web Site.

Improvement areas were discussed for the board to follow up on

·         Not doing bi-weekly walk around and/or not following up on obvious maintenance tasks

·         Trash on grounds and generally not looking good to a perspective buyer

·         Not following up with contractors

 

Kurt has solicited several Property Agents/Companies

-          Details of current Property Agent contract, posted to Village web site

-          Details of Request For Quote, RFQ, posted to Village web site

-          Hence if we loose our Property Agent could be very difficult to get another

 

There were no committees formed and no volunteers to present a business case to board.

Snow Removal Contract Renewal

  • Todd Fourier, Quality Touch Landscaping and Excavating 2010/2011 contract renewal was approved by the owners

 

06/23/10 Todd Fourier 2010/2011 snow removal contract, same cost last year

    -$70 per incident, Sanding $60 per application, Shovel Walks $25 per hr

 

Todd agreed to the following conditions:

The acceptance of the proposal is agreed to provided the attached requirements/clarification to the specifications of the proposal is met. I believe this is same intent as you added to your agreement but need to add some clarification to insure we are in agreement.

 

1.)         Keep access to Fireplace Ash (metal garbage) Can along side trash shed

2.)         Keep Trash Door Jam clear of snow so door closes

 

Please note that this includes keeping the trash door jam clear of snow and ice so the door closes. We had reoccurring issues as to owners forcing the door close causing damage to the doors’ hinges and jam.

 

 3.) Sand buckets, not salt, at end of each ramp, for owner use

 

As a requirement by our owners sand/salt buckets are to be at the end of each walkway ramp. Last year the buckets only contained salt, please work with Dave Parrot, 802-434-8580 with your recommendation on if the buckets should contain only sand or a sand / salt mix.

 

 4.) No high snow banks bldg B west side to allow Blue Flame access to propane tank

 

Please note the snow can be pushed up on / over the timber wall, but we need to insure there is at least a walkway section open in the snow bank, not a shoveled path down to the propane tank, to allow Blue Flame access to the propane tanks. We were called five times last year that Blue Flame could not deliver propane because their hose was not long enough to go up and over the snow bank and down to the propane tank.

 

Please continue to work with Dave Parrot with snow removal questions, including salt and sanding needs along with assistance with coordinating owners to moving their cars.

 

The following Snow Removal Proposals Were Discussed:

 

   Todd Fourier, Quality Touch Landscaping and Excavating

   John Herr, Custom Homework’s

   Neil Villeneuve, All Season Property Maintenance

   Larry Williams of Redstone

 

Discussion Topics:

Villeneuve is fix cost, kind of, and has very good reputation w/ other Assoc.

We been hiring Villeneuve to clear snow banks for propane tank access, when Fourier could not

Villeneuve has blower to cut parking lot snow banks down, Fourier does not

Villeneuve is providing full service maintenance to other Assoc. beyond snow removal

Fourier pay as we go, could be cheaper, could be more expensive

Fourier probably more receptive with working with Board liaison as far as when and how

 

It was discussed owners are generally pleased with Todd Fourier’s Quality Touch Landscaping snow removal services. Dave Parot is our point person for snow removal and lawn care. Snow Removal contractors work with Dave as to when their services are needed. Dave has saved the Assoc. a substantial amount of money by only deploying these services when needed.

 

It was discussed that the ramps, towers and walkways can get quite slippery, and to augment snow removal and sanding by contractor, Todd will provide the following additional services:

 

  • Sand buckets at end of each ramp, for owner use
  • Keep access to Fireplace Ash (metal garbage) Can along side trash shed
  • Keep Trash Door Jam clear of snow so door closes
  • No high snow banks bldg B west side to allow Blue Flame to access to propane tank

 

John Herr 2009/2010 snow removal quote:

   05/20/09 John Herr / Custom Homeworks Snow Removal

   -Plow before 6AM, with snow 4" or more

  -Per incident initial plowing and single follow-up $40

   -Shoveling ramp and stairs $20

   -Salting parking lot $25/hr

   -Sanding stairs and ramps $20/hr

 

Neil Villeneuve 2008/2009 snow removal quote:

05/17/08 Total yearly contract price $5,500 + $400 = $5,900

    -Three year commitment

 

Driveway will be cleared of snow by 6:30 AM if accumulation is approx 3 inches or more In the event of a lighter snow fall we may start later.  As soon as possible after driveways are cleared, walks will be cleared Sand and/or salt on driveway and walks will occur if conditions are icy. All available spaces will be cleared of snow (no piles of snow in spaces) In the event that the price of fuel at the pump, in the vicinity of the properties being maintained exceeds $5.50 per gallon for diesel or $4.50 per gallon for 87 octane, there will be and additional fuel surcharge in the amount of $10 per month. If prices continue to rise there will be an additional fuel surcharge at the rate of $10 per month for every $1.00 per gallon increase at the pump. The prices will be observed on the 1st of the month and will be included in the payment due on the 15th of that month.

 

06/23/08

Hi Neil, hope thing are going well for you, in preparation for our annual Village Owner meeting, questions in regards the All Season Property Maintenance 05/17/08 snow removal contract

 

In addition to the specifics mentioned in the quote, will you be able to perform the follow under the present bid?

    -Keep access to Fireplace Ash (metal garbage) Can along side trash shed

    -Keep Trash Door Jam clear of snow so door closes

    -Sand buckets at end of each ramp, for owner use

    -No high snow banks bldg B west side to allow Blue Flame to access to propane tank

 

05/26/08 Neil Response

Hi Kurt, The four items you listed can be added to the agreement for an additional $400.00 per year ($80.00 per month for the five months of payment).

 

 

Larry Williams of Redstone

Redstone is not interested in obtaining additional contracts from the Associations at this time to concentrate on their core resort business.


 

Lawn Care Contract

  • Todd Fourier Lawn Care 2010 Quote was unanimously approved by the owners

 

Summary of 2009 / 2010 Lawn Care Bids:

 

03/29/10 Todd Fourier Lawn Care Quote

   -$80 mowing & Trimming per event

   -Mowing and trimming will be done once every other week

   -Any other services will be performed by bid or hourly rate

   -If requested QTL&E will do mowing & trimming once a week

 

2009 Herr Lawn Care Contract

04/16/09 John Herr Landscaping and mowing quote

   -$75 per event, raking, liming, fertilizing, mulching, ect $25/hr

 

Discussion Topics:

Dave Parot is our point person for snow removal and lawn care. Contractors work with Dave as to when their services are needed. Dave has saved the Assoc. a substantial amount of money only deploying these services when needed. Please keep in mind our goal is not have pristine landscaping and keep costs to acceptable level.

 

 

Property Insurance Coverage:

2009 / 2010 Insurance Costs:

 

Our Village Master insurance policy was up for renewal in March.

 

  • Board unanimously voted to stay with "David Schramm of Mullen Financial Services and carrier Nationwide".

 

This year we have an annual increase in premium cost of $89

    -We do not expect any further decrease in our premiums

 

Insurance costs:

Dave Schramm Marketplace Insurance Center

03/12/09 Nationwide = $6,151.00    <-- 2010/2011 fiscal budget costs

     -Last year Nationwide costs $6,062.00  

     -It was discussed the cost of insurance is no longer going to go down and will probably have an

      annual increase of 4-6%

 

This policy coverage:

           -Comparable Director liability coverage that includes board member law suit coverage.

           -Buildings are insured for the proper amount;  full (Functional) replacement costs

                -Replacement value - Bldg 1 = 1,527,300 and Bldg 2 = 1,308,700

           -No water/sewer damage cost caps

           -Claim Deductible is $2,000

 

Slight Cost Increase:

$6, 062 - 2009/2010 - Nationwide. Premium

$ 6,151 -2010/2011 - Nationwide. Premium

-----------------------------------------------------

         $89 - Increase over last year

 

 

 

 

PROS of staying with Nationwide:

   -Been with them for awhile now, knows our good/continued history

   -Dave has been good to work with and responsive

   -Nationwide covers the majority of the Condo Assoc. in Burlington area

   -Village has been through several inspections with Nationwide and we have address all their 

    concerns

   -No inspection needed for this year to renewal

   -No $100k cap on water damage claim

   -Policy does cover damage caused by sewer and drain backup, others have limited coverage

 

Summary of Insurance Bids:

 

2009/2010 Dave Schramm Marketplace Insurance Center

Union Mutual of Vermont Companies = $5,951

Nationwide = $6,062.00

     -Last year Nationwide $6,038.00 

 

Dave also can quote polices for carrier Travelers:

Travelers indicated were not eligible due to the age of the building and

the proximity to the ski area (concern over units being rented on a short  term basis). 

 

 2009/2010 Nick Bergeron of Berg, Carmolli and Kent, Inc

Travelers =  $5,307,  probably additional cost for additional cap on water damage Total $5,390?

     -Last year -Travelers    $5,931.00 = $5,848 + $83  - Water/Sewer damage $100k cap

 

2007/2008 Cool Agency with carrier Middlesex Mutual:

PROS:

   -Much better initial premium cost with about the same coverage

   -Could be an additional $1.5k saving next year, if accepted and no losses

   -Guaranteed Functional Replacement Cost, which no one else offers

   -Middlesex Mutual does cover other Assoc. in the area

   -Wentworth II & III are using Middlesex Mutual

 

CONS:

   -Cool agency has not been responsive until Village owner Terese Ayer got involved

   -Cool agency initially indicated they do not do condo insurance, causing delays

   -Quote has contingences on receipts, review and acceptance, which is the inspection criteria

   -The discussion of second means of egress has not come up yet

   -Policy does not cover for water damage cause by water running for more than 14 days

   -Policy does not cover damage caused by sewer and drain backup

 

03/02/06 Kurt solicited Hickok & Boardman, Inc.

Agent would not complete quote without a 2nd means of egress from second and third story units. In addition because of the magnitude of the insurance claim on 05/16/04, if Village has another claim the company may decline to quote once again.

 

 

Additional Insurance Details:

--------------------------------------

Policies include Director/Property Agent liability coverage.

 

In 2004 the Village Directors took the initiative to solicit five insurance agencies in the area for quotes on "Special Form Property Coverage" (risk) insurance. Village was being required to hold this type of policy, at an increased premium rate, because of the magnitude of the insurance fire damage claim on 05/16/04. Based on the twelve plus quotes we received the Village Directors unanimously selected David Schramm, of Mullen Financial Services, as our insurance agent using Nationwide as their broker.

·         About triple the cost of 2003 fiscal year

 

As of May 2005 we are off high-risk insurance and substantially lower our premiums. Village will need to continue to be claim free for additional discounts. We as an Association need to demonstrate due diligence in eliminating as much risk as possible; therefore, the following action plans are in place:

 

  • Fire Sprinkler alarm and low temp unit monitoring installed
  • Annual unit Smoke alarm, Chimney and Fire extinguisher inspections
  • Insulating of building, mitigate freezing issues of water supply and drainage pipe
  • Tracking and replacing unit’s aged hot water heaters
  • Addition of an outside ash disposal can for unit fireplace ash
  • Clearly defined unit owners responsibility in by-laws, declarations and Rules and Regulations
  • Property Agent checking units for potential hazards during annual inspections
  • Continue to enforce no heating exclusively with firewood
  • Strictly enforcing grilling ban and VT fire codes

 

 

Board continues to solicit for less costly property insurance every year:

Bolton Valley Presidents council is also pursuing agents for bids in behalf of all the Assoc. on the mountain pooled together for better premium costs.

 

When soliciting bids agent typically would not complete quotes without a 2nd means of egress from second and third story units. In addition because of the magnitude of the Village insurance claim on 05/16/04, if Village has another claim the insurance companies may decline to quote once again.

  • In 2010 we will be six years claim free, hopefully can continue to get better rates

 

 


Regularly Scheduled Owners Memos to Proactively Address Reoccurring Issues:

Winter Memo:

Reminders to head off reoccurring winter issues of heating units during extreme cold snaps, snow removal, parking lot etiquette, firewood storage and no primary heating with firewood.

 

·         Mailed to each owner in November

 

Spring Memo:

Reminders to clean-up after pets, trash/recycling, parking lot etiquette and Assoc. schedule of maintenance activities.

 

·         Mailed to each owner in April

 

Summer Maintenance Memo:

Reminders for unit owners yearly maintenance check and repairs, ban on all grills, Board approval needed for modifications to exterior of buildings and common areas, Window replacement initiative. All part of insurance claim mitigation action plans

 

·         Mailed to each owner in June

 

 

Before We Address Concerns, Lets Talk Successes

  • Maintaining and verifying an accurate owner contact list, ie your questionnaire
  • Keeping owners informed of Assoc. actions with memos, email and newsletters
  • Controlled cost on budget, while Insurance cost tripled and funded $90k vinyl siding project
  • Wentworth II condos assessing one bed room $5k for new vinyl siding, Village did not assess
  • Bills are getting paid and on time, no delinquent fees, contractors actually want to work for us
  • All delinquent Assoc. fee owners are on payment plan
  • Property Agent has keys for all units,  and we continue to monitor
  • Tracking Aged Hot Water heaters replacement
  • Revised Bylaws, updated declarations and created Rules and Regulation doc
  • Continue to address renters Code of Conduct issues
  • Fire Sprinkler alarm monitoring installed
  • Propane fixed pricing acquired, with Blue Flame
  • Removed Water/Sewer from owner assessments 05/01/04
  • Managing trash/recycle bin costs
  • Up to date on Income tax, we were not with past management
  • Filed taxes ~$35 dollars, no payment, verses $1,000 in past
  • Continue to solicit competitive bid on insurance
  • Proactive annual maintenance on laundry machines tune-ups, waste drain lines snaked, fire extinguisher, smoke detectors and chimney cleaning scheduled

·     Regularly scheduled memos for reoccurring issues

 

 

 

 


The Numbers:

The number one comment at our 10/25/03 annual Association owner meeting was the high Association assessment fees owner’s pay and the lack of service they receive. Our Association addressed these concerns by engaging a new board of directors and hiring a new Property Agent to provide reliable service at a reasonable cost.

 

In 2003 a complete clean sweep, property agent, contractors, insurance; all new

  • Using John Herr as our primary general contractors
  • All Cycle trash removal is about the only contractor left
  • Plenty of growing pains and many, many hours spent by your directors

 

To assist in quantifying and prioritizing repair needs to the Village Condominium complexes A and B, an independent contractor was hired to perform a building inspection on 05/28/03 and 05/30/03. To this end, a Village Condominium Association Advisory Committee was formed to assist in facilitating the repairs and address concerns of communicating the Association actions with the unit owners.

 

To regain a handle on our budget, while financing major expenses such as vinyl siding, we started from a zero based, no frills, budget. We incurred major expenses in the following years to bring our building back to a maintainable state. The Directors continue to closely monitoring and scrutinizing our budget.

 

Village operating expenses are flat:

As you can see by our Village operating expenses are pretty flat between previous fiscal years. This is mainly due to the tremendous amount of tasks your directors handle at no cost to you. Our directors are inundated and are unable to take on any additional tasks. To continue to reduce/maintain operation costs, ie your Assoc. fees, the Assoc. will need to either hire additional contractors at a direct cost to owners or…

 

Owner committees needed to reduce Assoc. operating cost:

  • Committee needed to promote a sense of community and to assist in addressing owner conflict
  • Assist in keeping trash and recycle rooms clean
  • Monitoring inappropriate use of trash and recycling shed
  • Clean laundry room
  • Clean grounds
  • Bulk disposal day for owners
  • Blue flame gas fixed pricing / coop
  • Participation in Assoc. board
  • Participation in the Fire District and water quality pursuits
  • Participation in the town of Bolton Planning Board
  • Committee needed to manage storerooms
  • Committee needed to solicit condo insurance
  • Committee needed to solicit unit water meters
  • Moving mail boxes to Village property

 

 

Owners would like to use common area storage rooms:

 

06/30/07 Owners Committee formed to propose a plan, to the board, to manage storerooms

Heidi Hale and Ernest Levesque have formed a committee to pursue a plan for owners to use common area storage areas.

  • Please note, no usage or modifications can occur without prior board approval
  • No updates

 

The Assoc. has had reoccurring issue with owners using common area storage rooms. Typically what happens, the Assoc. ends up paying to have storage rooms cleaned out and dispose of trash from abandon junk left by owners. As a result the Assoc. has paddle locked the common area storage rooms. A few requirements that will need to be addressed in managing the storerooms before the board will approve for owners to use:

·         Not enough storage area for 21 owners

·         Need plan to fairly divide storage area up for individual owner use

·         Need to be fair in usage to existing owners and any potential new owners

·         Not much room to store bicycles, sporting equipment, etc…

·         No storage of grills, propane, gasoline, ect...

·         Need plan for managing locks and keys

·         Theft/damage cannot go against Assoc. insurance

·         Need plan for unit owner insurance to cover theft and damage

·         Should not be property agent responsibility or cost to manage

·         Need plan for deposit to cover damage or trash removal costs

·         Need plan and estimated costs on any needed modifications, ie shelving

·         Need plan to handle any owner disputes

·         Need owner committee to manage

·         Need exit plan if primary owners managing the committee sell and no owners picks up the task

 

06/30/07 Owners Committee formed to propose a plan, to the board, to move USPS mail boxes to Village Property

Jason Williams and Dave Parot have formed a committee to pursue a plan.

  • Please note, no commitments or modifications can occur without prior board approval
  • No updates

 

History:

    -BV poured new platform poured mail box on resort property

     -11/21/06 Post office moved mail box to new platform on resort property

    -10/21/06 Owners concerned of access to existing mailboxes

    -10/21/06 BV Pres meeting it was indicated Richmond post office will deliver to condo

        -Kurt to add to  wish list and committee actions

       -Need committee to propose maintenance room mailbox

 

01/30/07 Dave Parot performed initial investigation efforts to present business case at 2007 Village annual owners meeting. 02/02/07 Dave spoke with Richmond post master and discussed at Owners Meeting.

   -Maybe OK to put post boxes in enclosed area

   -Probably need 24 boxes, come in banks of 16 & 8

   -16 bank comes with larger package boxes

   -Need actual cost, but probably around $800 + T&M

 

A few requirements that will need to be addressed before the board will approve:

  • Need written confirmation the post office will deliver to approved mail boxes on Village property
  • Need written confirmation on if the mail boxes need to be outside or could be contained within common storage area
  • If mail box can be placed inside common storage area, need to coordinate activities with Heidi of the storage area committee
  • Cost estimate on time and materials and USPS approved contractor to perform the work
  • Will need viable plan by Tuesday May 13th, 2008 to include in 2007/2008 fiscal budget

 

Owner committee to organize Village party

No takers this year…

It was discussed to help promote a sense of community and to assist in address owner conflict issues getting the Village owners together for a gathering outside of Assoc. business would be very beneficial.

  • Proposing gathering after Village Annual owner meetings
  • Cost should not be covered out of Assoc. budget

 

 

 

 

 

 

 


Chapter

3

 

Kurt Ries, Village Director

It was discussed, that the Annual Owners Meeting is a face to face meeting with the owners. The Annual Owners Meeting minutes, in addition to being posted to the Village web site, are postal mailed to all of owners. Most other Assoc. business is carried out via Email. If you are not on our Village Email distribution list you are missing the majority of the information being distributed outside of the Annual Owners meeting. Please advise our property agent, if you do not have access to Email, and would like a hard copy of this information postal mailed to you.

 

As a cost saving measure the Owners Forum maintains a Village Email distribution list and a Village Assoc. web site. By utilizing these electronic distribution methods we have saved our owners several hundred dollars in postage a year, while greatly increasing the efficiency of the board.

 

Curent Village financial reports, Bylaws, etc.. along with everything you need to know about our Assoc. activities and our community, are conveniently available at our web site or by request from our property agent.

 

https://home.comcast.net/~itele2/

Password is ‘garth’

 

Village Mission Statement

  • Control operating costs, with continuous property improvements
  • Keep Assoc. cost to owners at a minimum, no frills budget
  • Follow approved decision making process
  • Keep owners informed, Village web site, email list, newsletters and memos
  • Insuring owners’ wishes and concerns, are addressed with Owner’s Forum
  • Continue to promote a sense of community

 

Village decision making process

The Village Owners Forum, maintains two lists, posted to our Village web site, if your concerns/suggestions are not on these lists it is not being addressed and you need to notify us.

 

Committee Action Items/Owners Forum Open Issues List:

 

  • A list of concerns, suggestions and solutions from the unit owners

 

Maintenance Task List:

 

  • A list of building maintenance and administrative tasks needs

 

On a bi-monthly bases the Village Directors discuss these tasks with our Property Agent, Joe Boylan and because of the quantity, available resources and costs we:

  • Prioritize the tasks
  • Balance the action with the finances available at the moment
  • Assign actions to board/committee members and/or property agent

 

Roles and Responsibilities

To reduce operation expenses the Village board and committee members, at no cost to you, have taken on much more responsibility than in the past, including:

 

Jason Williams – Village Treasurer

Creates, maintains and tracks Village budget

   -Manages vinyl siding bank loan

   -Keeps close eye on Village budget

    -New roof funding

    -Approves and monitors cost of Village maintenance activities

 

Mike Nielsen --- Village Director

   -Replacement window inventory

   -Communal Grilling area proposals

   -Regularly scheduled memo to head off reoccurring issues

 

Dave Parot --- Village Director

   -Bolton Valley Fire District

   -Building/Unit surveillance

   -Primary maintenance point person

   -Reviews Village Maintenance task list

   -Lawn maintenance point person

   -Snow removal point person

   -Propane Fixed Pricing

 

Joe Kareivis – Village Director

   -History of Assoc. and prior maintenance tasks

   -Kept us from repeating our past mistakes, insuring our continued success

   -Renters Code of Conduct actions

   -Emergency planning / Fire warden Tasks

 

Kurt Ries – Village Director

  -Chairs Association meetings

   -Provides meeting minutes

   -Solicits Insurance agencies for quotes

   -Works with legal resources

   -Revised and maintains Bylaws, Declarations, and Rules and Regulations

   -Aged Hot Water Heater replacement reports

   -Maintains Owners Forum action items

   -Maintains Owners Forum website

 

Joe Boylan – Village Property Agent

   -Maintains Village administration records and invoicing

   -Delinquent Assoc. fee success story, right balance of compassion and forcefulness

   -No more late fees on bills like prior management

   -Using competent and owner respected contractors

   -Manages contractors

   -Very receptive to working closely with the board

   -Assoc. management experience has proven invaluable

   -Manage Trash collection costs

 

Mike Brigham – Village Director

   -Maintenance Task person  

   -Reviews Village Maintenance task list

   -Sprinkler System Ongoing Monitoring

   -Laundry Room Bulletin Board

   -Exterior building light inventory

 

   -Onsite monitor of maintenance task progress

   -Trash/Recycling Ongoing Monitoring

   -Laundry Room Ongoing Monitoring

   -Work with Property Agent on Regular Occurring Scheduled Tasks

         -Cleaning out/snaking septic/drain lines, Roto rooter recommending to be done every 3 years

         -Annual Building Inspections scheduled for July/August

         -Assoc. Laundry Machine Tune Up, scheduled for September

 

Colleen Malloy – Village Director

  -Assisting Dave Parot and Mike Brigham with onsite maintenance tasks

  -Monitoring onsite contractors

 

 

2007 Owners Committee formed to propose a plan, to the board, to manage storerooms

  • Heidi Hale & Ernest Levesque

 

2007 Owners Committee formed to propose a plan, to the board, to move USPS mail boxes to Village property

  • Jason Williams and Dave Parot

 


Chapter

4

 

 

Jason Williams, Village Treasurer

 

2010 / 2011 Village Budget

Proposed 2010/2011 budget was reviewed, discussed and unanimously approved by the owners

  • It was discussed and owner approved Assoc. fees went up 0%
  • There was an $89 increase in Insurance costs
  • Village Fiscal year is July 1s t  2009 through June 30th 2010
  • Village fiscal year aligns with the town of Bolton fiscal year
  • See Appendix A – Village financial statements

 

Village Fiscal Year Quarterly Breakdown:

  -Q1 July/Aug/Sep        

  -Q2 Oct/Nov/Dec         

  -Q3 Jan/Feb/March     

  -Q4 April/May/June

 

Special Assessments and Raising Assoc. Fees

Up until 2009, the Village Assoc. fees have not gone up in eight years despite successfully completing major maintenance projects needed to bring our building back to a maintainable state. Unless we find additional ways to reduce costs, such as owners actively driving committees, Assoc. fees could go up next fiscal year.

  • Particularly in light of the need to seriously start funding new roof and ramps in three years

 

Rising Assoc. Fees:

It was discussed rising Assoc fees, a reasonable percentage, would not yield needed funds for 1.5 to 2 years.

 

Special Assessment:

If a special assessment were to be imposed on the owners, there is a high probability the Assoc. would have problems collecting all the assessments in timely manner and could contribute to delinquent Assoc. fees increasing. It is not so much some of the owners will not pay, it is more of an issue they cannot afford to pay.

 

Vinyl Siding Contingence Plan

As a reminder it was discussed that a contingence plan was unanimously approved at the 2004 Village Association Annual Owners meeting approving the board for an owner special assessment up to $20,000, only if needed.

 

The Assoc. is cutting the budget very close with the vinyl siding loan payments, however barring any unanticipated major expenses the board believes the vinyl siding loan payments can be funded without the need to raise owner Assoc. fees or an owner special assessment.

 

As a contingence plan to insure the Assoc. does not default on the vinyl siding loan a pre-approval for up to a $20k owner special assessment to cover any Assoc. unforeseen major expense was sought and approved at the 2004 annual owners meeting. It was discussed that the pre-approval would be in place for duration of the vinyl loan payments and the board would not feel comfortable moving forward with the loan without this contingence plan in place.

 

Note, the board would not assess owners the $20k unless there was an unforeseen major expense the Assoc. could not cover. The thinking is $20k assessment + $20k in cash reserves would about pay off the $43,438 bank loan.

 

The major driving factors for Village Assoc. fees are...

 

1.) Insurance cost

Our insurance fees are in line with other Assoc. that have new policies in the last couple of years. Hence with the magnitude of the insurance fire damage claim on 05/16/04 our policy was dropped and we needed to renew. Some/most of the Assoc. have been flagged for renewal, it is just a matter of time before the remaining ones get hit. The insurance cost is driving a good portion of the Village Assoc. fees. On a yearly bases the Village board solicits insurance agents to insure we have a cost effect insurance policy. In addition Village has implemented many initiatives to reduce our insurance claim risk and cost.

 

2.) Siding loan

Village did not assess the owner $5,000+ to install the vinyl siding on our complex like other Assoc. on the mountain did. Instead, the Assoc. absorbed the cost of siding by the board picking up much more responsibility at no cost to the owners and slashing the budget to bare minimum, while completing several major expense projects, to bring the complex to the maintainable state we have now. This is a major triumph and credit to our board and owners to put in the time an effort to bring this to solution fruition, something none of the other Assoc. have been able to do. On the down side it is also a factor in our very tight budget as Village did not access the owners curbing the annual Village Assoc. fees.

 

 

Detail Discussion of Budget

 

This memorandum is to act as a narrative for the owners of Village Condominium Association on the proposed budget for FY2011.  This budget was approved by the Village Condominium Association Board of Directors at its meeting on May 11, 2010.

 

Narrative for FY11 Budget – AS ADOPTED BY BOARD (5.11.10)

 

This narrative accompanies a spreadsheet (“Village Condo Budget FY2011 ver3 5.12.10”) dated May 12, 2010 for FY2011 (July 1, 2010 through June 30, 2011). 

 

Income

 

Association Fees

The Association will generate $66,894 in fee income.  As the budget was approved by the Board, there will be a surplus of $4,481. 

 

Laundry Income

Laundry income is budgeted to remain the same as the past three consecutive fiscal years: $2,200.

 

Additional Income

Additional income is budgeted to remain the same as the past three consecutive fiscal years: $0.  It is unclear at this time whether there will be any realized additional income from pending legal proceedings.

 

Total Income

Total budgeted income for FY10 will be $69,094. 

 

Expense

 

Accounting

Accounting expenses are budgeted to remain the same as the past three consecutive fiscal years: $50.

 

Association Management

Association management expenses are budgeted to remain the same as the FY09 fiscal year: $7,800.

 

Bank Loan – Siding

The Union Bank siding loan will be paid off early in FY11, and the contractor loan will expire in 2 ˝ years.  Siding loan payments are budgeted at: $7,752.

 

Bank Service Charges

Bank service charges expenses are budgeted to remain the same as the past three consecutive fiscal years: $50.

 

Chimneys

Chimney cleaning and maintenance expenses are budgeted to remain the same as the past three consecutive fiscal years: $1,000.

 

Electricity

Electricity expense is budgeted to remain the same as the past three consecutive fiscal years: $2,500.

 

Exterior Painting

Exterior painting expenses are budgeted to remain the same as the past three consecutive fiscal years: $1,000. 

 

Exterior Repairs

Exterior repairs expenses are budgeted to remain the same as the past three consecutive fiscal years: $2,000.

 

Fire Extinguishers

Fire extinguisher expenses are budgeted to remain the same as the past three consecutive fiscal years: $250.

 

Grounds R &M

Grounds maintenance expenses are budgeted to remain the same as the past three consecutive fiscal years: $2,610.

 

Insurance

Insurance premium expenses are budgeted to increase by 1.47% (or $89) for FY11, and are budgeted to be: $6,151.

 

Insurance Deductible

The incidental insurance deductible budget will remain the same as the past three consecutive fiscal years: $1,000.

 

Laundry Maintenance

Laundry maintenance expenses are budgeted to remain the same as the past three consecutive fiscal years: $200.

 

Legal Fees

Legal fees are budgeted (per Kurt’s recommendation) to increase to $5,000, representing a “worst case scenario.”

 

Maintenance Other

Miscellaneous unit repairs are budgeted to remain the same as the past two consecutive fiscal years: $2,000

 

Major Repairs

Major repairs expenses are budgeted at $8,300.  The following projects are included in the major repairs budget:

§      $3,000 budgeted for ramp repair on Building A

§         $4,500 budgeted for deck repair for three decks (123 and two on 222)

§         $300 budgeted for trash room wall repair

§         $500 misc.

 

Miscellaneous Expenses

Miscellaneous expenses are budgeted at $0.

 

Postage and Copy

Postage and copy expenses are budgeted to remain the same as the past two consecutive fiscal years: $600.

 

Propane

Propane expense is budgeted to remain the same as last fiscal year: $650.

 

Repair and Maintenance – Other

Miscellaneous other repair and maintenance expenses are budgeted to remain the same as the past three consecutive fiscal years: $500.

 

Roof

Roof expenses are budgeted to remain the same as the past three consecutive fiscal years: $1,000.

 

Rubbish Removal

Rubbish removal expenses are budgeted to decrease by $600 from last year due to a new contract.  Expenses are budgeted at: $2,400.

 

Sewer

Sewer expense is budgeted to remain the same as the last fiscal year: $500

 

 

Snow Removal

Snow removal expenses are budgeted to remain the same as the last fiscal year: $6,000

 

Special Assessment

There are no budgeted special assessments.

 

Sprinkler System Repair

Sprinkler system repair expenses are budgeted to remain the same as the last fiscal year: $3,000.

 

Sprinkler/Unit Monitoring

Sprinkler unit monitoring expenses are budgeted to remain the same as the previous three consecutive fiscal years: $500.

 

Supplies

Supply expenses are budgeted to remain the same as the previous three consecutive fiscal years: $250.

 

Storm Water Permit

Storm water permit expenses are budgeted to remain the same as the previous two consecutive fiscal years: $50.

 

Total Expenses

Total expenses are budgeted at $64,613.  This is a 6% decrease from FY10 budgeted expenses.

 

Net Income

 

Net Ordinary Income

Net ordinary income is budgeted to remain the same as FY10, and is expected to be: $69,094.

 

Net Other Income/Expense

There are no budgeted additional sources of income or expense.

 

Net Income Totals

The total net income is budgeted to be: $4,481.

 

Reserves

 

If the trend in income and expenses experienced to date in FY10 continues, then I would expect reserves to be in the $30,000 range in FY11.

 

Conclusions and Recommendations

 

I believe that we are on target – even with the unexpected expenditures in FY10 – to maintain as strong a financial position as previous years in FY10.  Given the elimination of much of the siding loan debt for FY11, the Association will begin to realize the goal accepted at the 2010 meeting: the laying of a financial foundation for the replacement of the roof and ramps in the coming years. 

 

 

See Appendix for approved Budget Spreadsheet


Chapter

5

 

Kurt Ries, Village Director

 

Past notable amendments to Village Declarations, Bylaws and Rules and Regulations documents were discussed see details below.

 

  • 2008 Declaration amendment, 93.16 % of owner approval signatures obtained and filed with the Town of Bolton

 

Discussion Items:

 

Village Legal Resource:

Discussed action plan to deal with on going owner issues with Ms. Ayer and pending law suit with Mr. Levesque.

 

  • The owners unanimously agreed they did not have an issue with how the Assoc. is approaching this issue

 

The Village Assoc. was sued in small claim court in 2007, by Village unit owner Terese Ayer, the court found in favor of the Assoc. The case revolved around the Assoc. up holding our Village Declarations and Bylaws because owner wanted their entire ceiling replaced, at Assoc. cost, for water damage that was caused by a common area element.

 

In addition, Village unit owner Mr. Levesque has a pending $15,000 law suit against the Village Assoc. for allocations that construction performed in Ms. Ayer unit below caused the floor in his unit to bow.  On 05/12/08 a Village Assoc. hearing was held with board directors to resolve dispute between Ms. Ayer and Mr. Levesque. Ms Ayer did not attend or acknowledge the hearing notice. Mr. Levesque and his attorney presented their case. It was agreed that Brice Simon our Village legal resource would work with Mr. Levesque’s attorney to legally purse Ms. Ayer to resolve issues with the owner.

 


 

Past Notable Bylaw Updates

 

Grills are expressly prohibited:

The use and the storage of charcoal and propane grills are expressly prohibited on balconies, wood patios or in common areas.  Barbecue grills may only be used in designated grilling areas approved by the Village Association board of directors. Owners should recognize that in accordance to Vermont Fire Codes, NFPA 1 3-4.7 and NFPA 1 30-3.3.8.2, all types of barbecue grills and their storage in and around public buildings are subject to regulation as to size and usage.

 

Communal Grilling Area

 

  • Topic was discussed and unanimously decided not to pursue grilling area at this time

 

Communal Grilling Area concerns include:

·         Cost to construct, how elaborate

·         Cost to maintain

·         Allocate cost in Assoc. budget

·         Location, between buildings

·         Approval from owners adjacent to the area

·         Hours of operation

·         Enforce hours of operation

·         Propane and/or charcoal

·         Lawn chairs and grilling paraphernalia

·         Waste container

·         Who will police the area

·         How does the Assoc. address complaints

·         Noise ordinance

·         Fire hazard, fire extinguishers

·         Comply w/ VT fire codes

 

 

Inappropriate Use of Trash and Recycling Sheds:

It was discussed that the Assoc. pays several hundred dollars a year for trash contractor to pick up items owners inappropriately disposed of in and around trash/recycle shed, ie dishwashers, tires etc…

 

  • Assoc. continues to monitor trash/recycle shed, along with annually distributing memos to all owners in regards to proper disposal of garbage and recyclables.
  • Assoc. currently does not have a viable plan to further address these issue and would appreciate owners assistance in monitoring

 

It was discussed to assist owner I doing the right thing, to have a bulk item trash day, where an owner with pickup could haul items to dump and charge owners accordingly.

  • Assoc. looking for committee members to plan and execute

 


 

Owners need board approval to modify common areas or exterior of building:

To address concerns with common look, voiding siding warranties and water infiltration issues all owners need approval by the board to modify anything on the common area / exterior of building.

  • This includes Windows, doors, propane gas lines, dryer vents, antennas, etc…

 

Snippet from our Bylaw documentation:

10. No improvements, alterations, work, painting or other activity affecting the exterior of the buildings as covered by the Declaration, including but not limited to alteration of Units windows and doors, will not occur without prior approval of the Board of Directors.  Approval shall be requested in writing sent to Boylan Property Management, P.O. Box 3135, Burlington, VT 05401, or such other address as is provided in writing to the Unit Owners.  The request shall set forth the work the Unit Owner proposes to perform, any anticipated impact on common elements or limited common elements, any diagrams of carpentry work, paint samples of any change in paint color, and the name, address and phone number of the contractor who is proposed to perform the requested work.  The Board of Directors, or their designee, shall, within twenty (20) days of such request, inform the Unit Owner, in writing, of its decision on whether the request is GRANTED or DENIED.  If the Unit Owner disagrees with the decision, the Unit Owner may request a hearing in front of the full Board of Directors, which shall be held within ten (10) days of the request.  The Board’s decision shall be final, and enforceable as if it were an obligation created by the Declaration or Bylaws.

 

 

The Board of Directors are empowered to impose reasonable fines

To change negative behavior and assist in enforcing approved Bylaws, Declarations, Rules and Regulations the ability to fine an owner after due process was added to Rules and Regulation document.

 

Guidelines for board to fine owners for non compliance

  • After due process, minor infractions could be $20-$50 dollars a day
  • Gross infractions a $100 a day, but recommended not to go any higher
  • When fines hit a substantial amount of money a lien is place in the property

 

 

Pet Issues and Concerns:

D.   Pets:

1. Household pets of unit owners are acceptable provided that:

a.        Pets are required to have a nametag identifying the owner.

b.       The property agent must be notified of the presence and appearance of the pet.

c.        The pet does not constitute a nuisance or threat to other persons.

d.       The pet is permitted to eliminate only in areas designated for that purpose. In cases of feces being dropped in inappropriate places(common areas, walkways, parking lots, etc.), owners are expected to immediately clean up after their pet with a “pooper-scooper,” plastic glove or some other device of choice of the owner.

e.        The pet, if outside, is at all times to be under leash control and in the presence of the 

        owner or other responsible adult. Otherwise, the pet is to be kept indoors.

f.         Balconies or decks are not to be used as dog runs or as areas of confinement.

g.       The pet is not allowed to bark to a point of  being a disturbance to others, either outside or in

        nearby condominiums.

 

2.  If a pet creates noise, damages property, is allowed to run loose without the presence of its owner, or in any other way creates an excessive disturbance or danger to others, the Board of Directors retains authority to terminate permission to keep the pet and, under the worst of circumstances, is authorized to call in the town dog warden to recommend the removal the offending pet.

 

3. The unit owner possessing a pet bears the financial responsibility for any damage, loss or liability caused by the pet (clean-up, material repair or replacement, rental loss, medical bills, etc.).

 

4.Lessees are not permitted to keep pets on the premises

 

Please clean up after your pet:

This is an ongoing issue with ours and other Associations on the mountain. Rules of conduct like these are very difficult to enforce. The Association empirically can really only appeal to the pet owner's to be responsible.

 

A container for plastic bags has been installed in the recycling room. These bags can be used to clean up after your pets.

 

The Village Association has addressed with the following:

·         Signs posted at each Village complex to clean up after your pets

·         Revamped Bylaws and Rules and Regulates to better clarify Association polices

·         Regularly scheduled memos to all Village owners reiterating Association polices

·         Continue to work with other Association to help curtail the issue

·         Continue to reinforce  Association policies at Annual owners meetings

·         Board has furnished a plastic bag dispenser for pet cleanup

 

In addition, the Bolton Animal Control officer was notified of issues with pets running loose and pet related  issues like these. Prompting a memo from the Town of Bolton postal mailed to all owners on the mountain. Associations on the mountain are encouraging all residents to call the Bolton Animal Control officer at 802-434-3968 to help enforce town ordinances on these types of infringements.

 

We are looking for someone like you to head up an Association committee to, make recommendations and see if the issue can be further addressed.

 

 

 


Village rules and Regulation Addendum

Village Repairs to Owner’s Unit Policy:

 

Intent:

In order to be consistent and fair to all parties involved with regards to how owner unit repairs, at the cost of the Village Assoc., will be performed. Along with assisting in mitigating and containing Village Association costs, the Village Association has adopted the following policy.

 

Village condos units are constructed one on top of one another and, even with the many pro-active initiatives in place to head off these types of issues, there are still several water stains a year. The majority of units, if not all units, have had ceiling, walls and flooring patch repairs. Replacing the unit’s entire ceiling, walls and flooring, etc is cost prohibitive and unreasonable to budget for by asking owners to fund the expense.

 

To mitigate these types of cost the Assoc. cannot set a precedence of replacing entire ceiling, walls, flooring ect. for water stains. This would open the expectation that twenty one unit owners, that have had patch repairs done, could have their entire ceiling, walls, flooring ect. replaced. Estimates for replacing entire ceiling, walls, flooring ect. in each of our units could exceed $30,000 which Village is not budgeted for and Assoc. fees would need to be raised or special assessments needed to all owners to fund these costs.

  • See actual legal wording in revised 2.0 Rules and Regulation document

 

Village Repair to Owner Unit Policy:

In the event an owner’s unit is damaged from common area element that the Assoc. is responsible for, the board at is sole discretion, will decide the extent of the decorated surface repair to the owner’s unit.

 

In compliance with Village Bylaws, Section 3.13, the Assoc. is exempt from liability for damage caused from a unit or person caused by water leaking from any common area element. However, as a matter of practice and as a service to our unit owners, the Assoc. typically pays for patch repairs caused from common area water damage.

 

By acceptance of the Village Bylaw/declarations when owner’s purchased the unit, the owner accepted this risk.

 

If the owner, at their own cost, would like a more extensive repair and/or an upgrade in materials, at the boards sole discretion, typically will give the owner a check for the Assoc. contractor quoted cost of the Assoc. approved repair, and the owner can purse the repair.

 

Owner’s repairs must meet all requirements and Assoc. approvals as provided by Bylaws, Declarations and Rules and Regulation documents.

 

In the case of a dispute, the Village Association Directors will decide, in their sole discretion, how the repair will be performed and how the costs shall be distributed among the parties involved in the subject repairs.


 


Chapter

6

 

 

Kurt Ries, Village Director

 

Major 2010/2011 Maintenance Projects:

Owner Approved Maintenance Tasks From Budget

 

$0 Pro Tech to replace the Low temp sensors 

    -Not pursuing at this time

 

$0 Move Postal Mail Boxes to Village property - est $1k

    -Not pursuing at this time

 

$0 Gutters

    -Not pursuing at this time

 

$1,200 Water Aprons Below Ramps - est $2k

       -Agreed to pursue Bldg B drainage tasks

       -11/16/07 completed bldg A drainage updates ~$750

 

$0 Removal of Building B rock wall

    -Not pursuing at this time

 

$4,500 Deck and ramp repair

    -Agreed to 3 decks (223, 224, 123) repair and continue to pursue the other 5 decks next fiscal

    -We have committed the Assoc. to do the repair of the #223 deck this summer, est $1,800, as it was

      a contingence on the sale of the unit.

    -These are Time and Material costs and not a fixed costs, last round of actual deck repair cost had a

      cost over run, ie more than the quoted, of greater that $6k.

  

 We received a details quote from Herr on 04/16/09 that included additional decks:

    04/16/09 Herr Deck quotes

    #223, total rehab $1,800

    #224 - $1,200

    #123 - $1,600

    #127 - $800

    #227 - $800

    #327 - $800

    #222 - $1300, lower

    #222 - $1,100 upper

    ---------------------------------

    Total $9,400

 

$1,000 Move rock in parking lot

    -Not pursuing at this time

 

$2,500 Smoke Detector/CO Replacement

    - Agreed to replace on a case by case bases, at Assoc. cost

 

Additional Details on Maintenance Tasks:

 

1.) Water Aprons Below Ramps

 

Summary of drainage action plans:

 

To mitigate water drainage around our complex

    -07/31/06 Parking lot was graded and resurfaced, to mitigate storm water run off towards bldgs

    -Building B shed was removed

    -Building B new retaining wall put in place with additional drain apron

    -Assoc. worked with resort and town to replace, clean out and enhance storm water drainage

     affecting Village

    -Assoc. insures drains and culverts are clear of debris each spring

 

To assist in mitigate standing water acquired estimates on building gutters

   -Contractors indicating majority of the problems are from water run off of the ramps and not water

    run off of the building

   -Gutter are still on our maintenance task list, however the owners voted to budget for the water

    apron enhancement work first and then evaluate the need for gutters

 

Need better drainage to drains under ramp

 

09/13/07 Todd provided est for bld B, $1,700

   -Bld B showing drainage to stream not drain

   -Owners approved Bldg B drainage updated for 2009/2010 budget

 

09/17/07 Todd providing Bld A quote

   -11/16/07 Todd completed bldg A drainage updates ~$750

   -No reported concerns of Bldg A water issues since drainage updates were completed

 

2.) Building B rock wall fell apart

Need permanent fix

   -01/31/06 This is probably not in the budget for 2006

   -05/11/06 John Herr looking to cut bank back

 

01/30/07 Joe B picked up task to work with Todd Fourier on bid est for removing rock wall along with Bldg B drain apron efforts

 

01/29/08 Joe B working with Todd Fourier on bid est for removing rock wall along with Bldg B drain apron efforts

 

3.) Rain Gutters

      -3rd floor gutters only?

      -Maintenance issues?

     -Were would gutter run off be directed to?

 

12/06/05 Kurt and Joe B discussed for item at annual meeting

    -12/06/06 Joe B to get gross est. for 3rd floor gutters and effort involved     

    -01/31/06 $4 - $5 dollars a foot, $4k-5k

    -01/31/06 Estimate Bldg A & B installed 3rd floor only w/ down spouts $4-$5k

    -01/31/06 This is probably not in the budget for 2006

 

01/29/08 Joe B to get new estimates and advice on value add

   -05/27/08 $5 - $8 dollar a foot $5k est

   -Contractors indicating probably not going help pooling water issues

 

Owners agreed not pursuing at this time

   -Does not appear to correct any water infiltration issues

   -Does not appear to correct any water pooling issue

   -Water pooling under ramps not bldg

   -Ground grading water apron upgrades around bldgs already started

   -On-going additional cost for maintenance

 

4. Laundry Room Improvements

    -12/11/05 Gap in sheet rock from pipes/wires

    -12/11/05 Gap in sheet rock around floor moldings

    -Discussion for our 01/31/06 directors meeting

    -01/03/06 Joe B caulked/repaired gaps ect...

    -01/31/06 Joe B has done several improvements already

 

Not pursing at this, will evaluate budget/need again next year

 

5.) Trash/Recycling Sheds Improvements

New exterior/interior walls/floor?

More bins?

    -01/31/06 Joe B has done several improvements already

 

11/14/06 need sign in trash room no fireplace ash in trash a major fire hazard, use ash can

   -01/02/07 Joe B checking for better signs/ more noticeable

   -01/30/07 posted permanent signs

 

01/30/07 Joe B picked up task to investigate installing door on recycle side

   -Need actual costs, but probably around $300 for installation of door

   -Probably would need floor to install door

 

Not pursing at this, will evaluate budget/need again nest year

 

6.)  Outside Unit Light Fixtures

Light replaced in 2002, with fixtures not holding up to the salt of outdoor use.

      -Lights are currently intact, structurally sound and purely cosmetic damage

     -Kurt discussed with Joe K 08/11/03 and we are not going to replace at this time

 

Not pursing at this, will evaluate budget/need again next year

 

7.) Budget for New Roof

    -Start in earnest to build reserves to cover for new roof in 3-5 years

    -06/14/06 Roofer coming out

       -06/14/06 Roofer getting bid for new roofs and timeline

       -Timeline we have 5-10 years, if both sides are architectural

 

*** Roof replacement quotes

    06/14/06 Roofer getting bid for new roofs and timeline

    01/30/07 Joe B is currently working with two roofing contractors for estimates

       -Roof was replaced around 1995 for about $21,500

       -Need to wait for snow to clear so they can get on roof

 

05/07/07 David Dupont estimating $60k to replace roof, easily go to $80 w/ repairs

   -At these costs standing seam roof is an attractive option

   -Includes 30yr shingles, removing old shingles, does not include any needed plywood replacement

   -07/21/07 David  Dupont completed misc, roof repairs

   -5-10 years left on the roof, does have some punking but not bad

   -Roof is staggered, could phase in, do hot spots first

   -03/12/08 Joe B getting est for standing seam roof

 

7.) Porch / Railing repairs

      -2001 porch railing caps were replaced

     -12/29/06 Kurt spoke to John H to provide list of repairs to Joe B

     -01/02/07 this is not an approved task as of yet

 

01/30/07 Joe B picked up task to do walk around with John Heir and make recommendations to board on what should and should not be done

     -Need to prioritize tasks 1.) has to be done, 2.) nice to done, and 3.) not a priority

 

09/05/07 Joe B mentioned #221 and #126 decks are the worst

   -$400-$500 each to repair

   -Joe suggested to do just those decks now

   -Needs a complete deck inv of repairs

   -09/05/07 Contractors indicating entire decks do not need to be replaced, just 2 joists & railings

 

09/25/07 Joe B Inventory

   -#221 & #126 should be priority

   -#125 needs boards and spindles

   -#124 needs boards on deck. 

   -#123 needs boards and spindles

   -#222 needs a few spindles

 

11/15/07 Dave working with contractors for written quotes

   -To be completed spring 2008

    -03/11/08 Joe B following up John Herr for repairs

 

We received a details quote from Herr on 04/16/09 that included additional decks:

    04/16/09 Herr Deck Quotes Summary

    #223, total rehab $1,800

    #224 - $1,200

    #123 - $1,600

    #127 - $800

    #227 - $800

    #327 - $800

    #222 - $1300, lower

    #222 - $1,100 upper

    ---------------------------------

    Total $9,400

 

8.) 09/18/07 Mike B investigating Moving Rock in Parking Lot

    -What are we going to with it, move to lawn, remove from property?

    -Park lot may need to resurfaced in the area where the rock was

    -Delays in deploying as contractor finding it a problem to move such a large/heavy object

    -10/25/07 Mike B maybe resort can move, following up w/ Neumann

    -Probably deploying summer/fall 2008

    -01/29/08 adding to 2008/09 budget, est $500 mv rock, $200 to resurface area??

 

Not pursuing at this time

 

9.) Exterior Painting

Miscellaneous exterior painting needed

Joe B has contracted to John Herr for spring/summer of 2010

 

10.) Carbon Monoxide Detection

10/12/07 Joe K investigating hard wired Carbon Monoxide detectors

   -10/30/07 Joe B following up with electrician for ball park quote, maybe no site visit

   -11/08/07 Electrician Dave King doing some of Joe B’s other condos

   -Must be hardwired by bedroom, cannot be outlet plug-in

   -Units sold in 2008 will need hardwired CO detectors, before closing

   -To be included in budget, starting 2008/2009

 

Joe B initial cost estimates are...

   $65 -- Smoke/CO combination Detector

   $55 -- hr rate of electrician

   -----

   $125 -- plus tax, per unit

   $125 X 21 units = $2,625 Assoc. project cost

 

 05/16/08 Complete Actual cost was $1,220

   -Unit #221 Ayer refusing entry to unit and was not complete

   -11/13/09 Unit #221 Ayer completed with additional contractor cost to return

 

11.) Rinnai Heater Recall

         -Mike B followed up

Description: The recall involves Rinnai EnergySaver Direct-Vent Wall Furnaces, Models RHFE 431 and RHFE 556. They are either natural gas or LP gas (propane) fueled. The following model numbers are included in the recall:

Model RHFE-431

FAIII-N

FAIII-P

 

WTA-N

WTA-P

 

WTA-72B-N

WTA-76B-N

 

 

 

Model RHFE-556

FAIII-N

FAIII-P

 

WTA-N

WTA-P



http://www.cpsc.gov/cpscpub/prerel/prhtml08/08199.html

 

12.) Vinyl Siding Maintenance

         -05/2010 vinyl sofets/siding are loose or blown off

 

13.) Laundry Dryer/Washing Machine not working

          -Mike B is pursing details

 


 


Chapter

7

 

Unit Window Replacement Project:

Mike Nielsen, Village Director

 

Window inventory was provided to all owners with the Annual Meeting notification and agenda. Mike is maintaining an inventory of windows in our buildings that have not been replaced.

 

The Assoc. is going to keep focused on owners to replace these windows to insure our building are weather tight. Please be certain to update Mike, when your windows are replaced.

  • 10/26/02 Village Association annual meeting approved the mandatory window replacement
  • 03/14/05, Dan Plimpton completed window inventory update
  • 02/28/05 Kurt discussed w/ All Season a bulk window installation date and cost
  • 03/17/05 Dan Plimpton memo went out to all owners on bulk window replacement
  • 05/17/06 Not many unit owners took advantage of the reduced cost bulk window replacement
  • Window Replacement initiatives are included with annual Village summer memo

 

Important Note:

For windows and doors owners replace after vinyl siding was completed in spring of 2005, the Assoc. is not funding the expense for vinyl siding contractor to return and complete window installation; including replacement of aluminum clad on exterior window trim or window trim. Unit owners will be held liable for these types of expenses.

 

Village Exterior Doors and Window Replacement Policy:

To insure uniformity, proper operation and that the integrity of the vinyl siding, insulation, and trim are not compromised, only materials and contractors approved by the Village Association Board of Directors are permitted to install exterior doors and windows, including sliding glass doors, at the Village Condominiums.

 

If an owner would like to use materials or contractors for exterior doors and windows, including sliding glass doors, other than what is approved by the Village board of directors, the owner must acquire written approval, prior to any work being performed from the Village Board of Directors.

 

Explanation:

The Board of Directors of Village Condominium Association at Bolton Valley strives to improve the quality of life for all Village condominium association owners.

 

In doing such, the owners at the October 26th, 2002 Village Association annual meeting voted and approved to have all original exterior doors and windows replaced, including sliding glass doors, at the owner’s expense, to help ensure our buildings are weather tight.

 

Per Village Bylaws and Declarations owner are responsible for repair and replacement costs associate with the exterior doors and window.

 

In the spring of 2005 vinyl siding was installed that included insulation and aluminum clad to the trim on the exterior of buildings A & B.

 

At the 06/25/05 Village Association annual owners meeting the Rules and Regulation addendum that owners will need approval from Assoc. for any modifications done to exterior of building and common areas was approved. This includes exterior window, sliding doors and door replacement. This clause was needed  to insure window and door uniformity, proper operation and that the integrity of the vinyl siding, insulation, and trim are not compromised by a variety of unmonitored contractors performing work on the exterior of our complexes.

 

Approval Process:

At the sole discretion of the Village Association board of directors bases their material and contractor approvals on, but not limited to, the following:

  • Competitive cost on materials and labor
  • Quality of workmanship
  • Warranty on materials and labor
  • Ensure that the exterior siding is not compromised.
  • Ensure replacement windows and doors are uniform
  • All Season honoring vinyl siding warranties performed by another vendor

 

The Assoc. is also looking to approve additional contractors, be certain to seek approval before committing to contactor.

 

Village Association Approved Window and Door Contractors.

As of 01/30/07 the Village board of directors has approved the following vendor only as the Village Association contractor for windows and doors:

 

Jobsite Services, Inc.,

Eugene Hatin III

229 Joey Drive

Colchester, VT 05446

802-872-7191

Fax - 802-872-7192

 

If an owner would like to use materials or contractors for exterior doors and windows, including sliding glass doors, other than what is approved by the Village board of directors, the owner must acquire written approval, prior to any work being performed from the Village Board of Directors.

 

Pricing as of 06/13/08

 

Stanley Single Vinyl Casement -- $419

Windows with low-E and full screen

 

Stanley Twin Vinyl Casement -- $762.00

Windows with low-E and full screen

 

Stanley Triple Vinyl Casement -- $983.00

Windows with low-E and full screen

 

Stanley Vinyl Patio Door 6'0" X 6'8" – $1,100.00

 

With low-E and tempered glass full screen 

   Additional $50.00 per to re-cap exterior

   Additional $75.00 to re-trim interior

 

·         All prices include removing and disposing of existing windows/doors.

·         Providing and install new product.

·         All of these products have a factory lifetime warranty and a Jobsite Services, Inc. one year guarantee on labor.


Village Condominium Window Replacement Project

   -05/10/07

 

Owners are responsible for the cost and scheduling of replacing old wood windows in their units. Windows are listed by unit number, location in accordance to the interior and floor if applicable (for two floor condo units only). Measurements were not taken. North Side refers to the side of the building facing the parking lot. All windows listed are old windows and need to be replaced.

 

Unit Number

Windows to be replaced

123

North:

1 – kitchen

1 – entrance

South:

1 – triple pane

124

North:

2 – bedrooms

West:

1 - sliding glass door

South:

1 – sliding glass door

1 - deck facing DR

125

North: NONE

East: NONE

South:

1– bedroom

1 – triple pane

1 – sliding glass door

126

North:

1 – entrance

1 – kitchen

1 – bedroom

South:

1 – Bedroom

1 – sliding glass door

127

NONE


221

North:

1 – 2nd floor entrance

East:

2 – 2nd floor small bathroom

222

North:

2 – 1st floor bedrooms

1 – 2nd floor entrance

1 – 2nd floor kitchen

South:

2 sliding glass doors (1st and 2nd floors)


 

223

North:

1 – kitchen

1 – entrance

1 – bedroom

South:

1 – LR

224

North:

1 – bedroom

West:

1 – bedroom

1 – LR

South:

1 – sliding glass door

1 – deck facing DR

225

NONE

226

North:

1 – entrance

1 – kitchen

1 – sliding glass door

South:

1 – bedroom

1 – triple pane

1 – sliding glass door

227

NONE

228

North:

1 – 1st floor bedroom by 127 entrance

1 – 2nd floor entrance

West:

2 - 1st floor small bathroom

1 – 1st floor triple pane

South:

1 – 2nd floor LR

321

1 – small bathroom

322

North:

1 – entrance

1 – Living Room (LR)

South:

2 – LR

1 – sliding glass door

323

South:

1 – triple pane

324

North:

1 – bedroom

West:

1 – bedroom

1 – LR

South:

1 - sliding glass door

1 – deck facing DR


 


325

North: NONE

East:

1 – LR

1 - sliding glass door

South:

1 –deck facing LR

326

NONE ????

327

South:

1 – sliding glass door

1 – triple pane

328

None

323

South:

1 – triple pane

324

North:

1 – bedroom

West:

1 – bedroom

1 – LR

South:

1 - sliding glass door

1 – deck facing DR


325

North: NONE

East:

1 – LR

1 - sliding glass door

South:

1 –deck facing LR

326

North:

1 – entrance

1 – kitchen

1 – sliding glass door

South:

1 – bedroom

1 – triple pane

1 – sliding glass door

327

South:

1 – sliding glass door

1 – triple pane

328

None

 

 


Hot Water Heater Aging Report

Green Mountain Power Rental Electric Hot Water Heater                                                  

   -05/11/06                   

 

In an effort to mitigate water damage to your unit and curtail insurance claims, we are tracking electric hot water heater in our units for being past their manufactures suggested end of service to be flagged for replacement by the unit owner. Hot water heater are either purchased by the owner or rented from Green Mountain Power. If rented by Green Mountain Power they will be replaced at no charge with the signing of a three-year rental lease. However, the Village Association is requiring a drip pan be installed at the owner’s expense for about twenty-five dollars.            

 



Chapter

8

 

 

Kurt Ries, Village Director

 

Village Owners Forum Open Issues:

The following is a list of Village Owners wishes, comments and concerns and are updated regularly on the Village Association web site, to insure details are not lost and issues are being addressed. Note, if your comments or concerns are not on the following list, they are not getting addressed. Please update the Owners Forum to insure your concerns are being addressed.

 

We are soliciting for resources to assist in bring the tasks to fruition.  Two owners over coffee can complete one task in a few hours versus, two resources performing all the tasks takes weeks.

 

The following is the current Owner’s Forum open issue list:

 

Owners Forum Open Issues List:

   -06/20/08

 

1.) 04/22/06 Several Owners inquiring about owner use of storage rooms

Owners would like to use common area storerooms:

Typically what happens is Assoc. ends up paying to have storage sheds cleaned out and dispose of trash. As a result the Assoc. has paddle locked the common area storage rooms. A few issues that will need to be addressed in managing storerooms:

·                     Not enough sheds for 21 owners

·                     Divide storage sheds up for individual owner use

·                     Not much room to store bicycles, sporting equipment, etc…

·                     Managing Locks and Keys

·                     Theft, cannot go against Assoc. insurance

·                     Unit owner insurance cover theft and damage

·                     Should not be property agent cost to manage

·                     Deposit to cover damage or trash removal costs

·                     Need Owner committee to manage

 

Owners Committee formed to propose a plan, to the board, to manage storerooms

·                     Heidi Hale and Ernest Levesque

 

2.) Miscellaneous unit owner issues

Please, let’s all be responsible for our own destinies and have open friendly communication with our neighbors and discuss conflicts openly and politely. With a little give and take mentality, most if not all conflicts can be resolved to the mutual agreement of all involved.

 

 

 


 

Need owner committee formed to organize Village party

It was discussed to help promote a sense of community and to assist in address owner conflict issues getting the Village owners together for a gathering outside of Assoc. business would be very beneficial.

·                     Proposing gathering after 2008 Village Annual owner meeting

·                     Cost should not be covered out of Assoc. budget

 

3.)  Pet cleaning up and running loose

This is an ongoing issue with ours and other Assoc. on the mountain and of course without catching the pet in the act and a convincing way correlating the infringement with the pet owner, the violations are very difficult to enforce. The Assoc. empirically can really only appeal to the pet owner's to be responsible.

 

The Village Assoc. has addressed with the following:

   -Signs posted on each Village complex to clean up after your pets

   -Revamped Bylaws and Rules and Regulates to better clarify Assoc. polices

   -Regularly scheduled memos to all Village owners reiterating Assoc. polices

   -Continue to work with other Assoc. to help curtail the issue

   -Continue to review Assoc. policies at Annual owners meetings

   -Board discussing furnishing a plastic bag dispenser for pet cleanup

 

In addition, via the BV Pres Assoc Pres Council, Bolton Animal Control officer was notified of issues with pets running loose and these types of associated issues. Prompting a memo from the Town of Bolton to be postal mailed to all owners on the mountain.

 

·         All the Assoc., on the mountain, are encouraging their residents to call the Bolton Animal Control officer to help enforce town ordinances on these types of infringements.

 

From Village R&R

 

d. The pet is permitted to eliminate only in areas designated for that purpose. In cases of feces being dropped in inappropriate places(common areas, walkways, parking lots, etc.), owners are expected to immediately clean up after their pet with a “pooper-scooper,” plastic glove or some other device of choice of the owner.

 

e. The pet, if outside, is at all times to be under leash control and in the presence of a responsible adult. Otherwise, the pet is to be kept indoors.

 

4,) USPS mailboxes not convenient to Village

 

The mailboxes are currently on Bolton Valley resort land and are shared by multiple residents on the mountain.

 

Move Postal Mail Boxes to Village property

     -BV poured new platform poured mail box

     -11/21/06 Post office moved mail box to new platform

    -10/21/06 Owners concerned of access to existing mailboxes

    -10/21/06 Pres meeting, Richmond post office will deliver to condo

     -Kurt to add to next years wish list and committee actions

    -Need committee to propose maintenance room mailbox

 

01/30/07 Dave picked up task to do investigation efforts to present business case at Village annual owners meeting for owner to vote on.

 

02/02/07 Dave update:

Dave spoke with Richmond post master

   -maybe OK to put post boxes in enclosed area

   -Probably need 24 boxes, come in banks of 16 & 8

   -16 bank comes with larger package boxes

   -Need actual cost, but probably around $800 + TM

 

Owners Committee formed to propose a plan, to the board, for moving mail boxes to Village property

·         Jason Williams and Dave Parot

 

7.) Unit Water Meters

   -There are no water meters, cost is calculated from number of bedrooms

  -Would insure owners paying fair share of water/sewer costs

-Pros, owner would be charged W/S on what they actually used

-Cons, Seasonal owners use would need to be covered in base rate

  -Water/Sewer cost no longer managed by Assoc.

  -Owners concerns keep coming up

  -Not aware of any of the Assoc. or private homes that have meters on the mountain

  -Owner committee needed, if owners would like to pursue

 

PROS - owner would be charged W/S on what they actually used

CONS -Seasonal owners use would need to be covered in base rate

 

8.) Snow Removal Concerns

     -10/28/06 Owner concerned no plowing or shoveling for early season snow

     -02/06/07 Owner call to Joe B about the poor job Assoc. is doing

     -02/14/07 Owner caused issue w/ moving his car after big snow fall

     -02/20/07 Dave got call from owner about shoveling roof and cracks in walls from shifting

                     building

 

We went to coarser aggregate of rock this snow season because the sand and salt of past seasons was not staying in place very well. The larger aggregate rock appears to working for better, for the most part, by staying in the parking lot and not getting washed out to the sides. I will also insure the topic is discussed at our up coming Village directors meeting.

 

Sand buckets for stairwell/parking lots

   -01/07/07 Salt buckets in place on each ramp

 

02/20/07 Resort pushing snow on to Village cars in parking lot

   -Owners car got buried

   -Joe B spoke with resort manager Mike Gallas

    -No additional issues to date

 

9.) Parking Issue

Village Bylaws, Rules and Regulations does not limit the number of vehicles occupants from an owner rented unit can have in the lot.

 

From Village Bylaws

Section 5.08 Restrictions on Use of Units: Rules and Regulations.

8) Unit Owners shall have priority regarding use of parking spaces, and the executive board shall promulgate such rules or regulations relating to parking as to further the purposes of this section.

 

From Village Rules and Regulations

E. Vehicles:

1. Each unit is entitled to one parking space near the unit. Specific locations may be designated by the Board of Directors if authorized at an annual meeting of the Association. All other cars will park in the unreserved parking areas of the resort. No additional motor vehicles or trailers, boats or recreational vehicles (registered or unregistered) are to be parked in condominium parking lots, except temporarily and for short durations, but then only with prior written approval of the Board of Directors.

 

It was discussed 01/31/06 that there are several actions the board could take, but will need several hours of at least one director’s or committee members time to take the lead on the task from beginning to end. Property Agent can assist in such matters but should only be taking action prescribed by the board.

            -No directors or owner committee members were willing to take on task

            -Including in spring memo to all owners

 

10.) Satellite Dishes Placement

   -12/01/05 Owner mounted Satellite Dishes on roof chimneys of complex, since been removed

   -12/22/05 Village legal resource responded to Kurt’s FAA questions

                   Assoc. is OK to enforce unit deck only mounting

 

Owners continue to be concerned with ascetics of Satellite Dishes mounted to unit decks. According to FAA regulations an Assoc. cannot prevent the installation of Satellite Dishes; however we can restrict were they can be mounted as long as an acceptable signal can be received.

 

11.) Association to solicit other condo insurance company for cost savings and less stringent restrictions

 

Kurt continues to solicit more cost effective insurance quotes, however because of magnitude of the fire claim on 05/16/04 and no second means of egress, from second and third story units, agents have been challenged to provide their less costly options.

 

Vermont Fire codes do not permit open flames barbecues and regulates the size of the propane tanks on communal habitats. In addition, Village has retained a reduced insurance rate for banning grills because of the high fire risk they create.

 

12.) Inappropriate use of trash and recycling shed

It was discussed 2006 Annual Owners meeting that the Assoc. pays extra a year for trash contractor to pick up items owners inappropriately disposed of in and around trash/recycle shed, ie dishwashers, tires etc…

 

Assoc. continues to monitor trash/recycle shed, along with annually distributed memos to all owners in regards to proper disposal of garbage and recyclables.

   -Assoc. currently does not have a viable plan to further address these issue and would

    appreciate owner’s assistance in monitoring

 

13.) Rugs on floors of upper units needed for noise abatement

Many units have non-carpeted floor installed, please be cognizant this can create a fair amount of noise for your down stairs neighbors. Please do what you can to reduce foot traffic noise in your unit.

 

14.) Building Maintenance and Assoc. Management concerns

04/01/07 Kurt spoke to owner, in regards to phone calls to Directors, he seemed to be concerned with:

   -If building been inspected by licensed engineer, I indicated it was inspected

   -Because of noise on windy days wants rafters reinforced, asked him to put his request in writing, no

     response to date

   -Concerned over building shifting, I indicated the building moves a fair amount from season to season

    and without a new foundation not much can be done

   -Concerned our property agent does not work on weekends; I indicated our property agent in many

    non-emergence situations coordinates a general contractor to do the work. Once the owner reported

     the issue there was a contract on-site in 48 hrs.


 

 

15.) 05/15/07 unauthorized unit entry by contractor and contractors not cleaning up after themselves

 

It was discussed at the 06/30/07 Village Annual Owners Meeting that our property agent was unexpected hospitalized and serious breach of our Village notification policy was made by our contractor. The board apologizes for the mistakes and has put actions in place to mitigate future issues.

 

Property Agent will adhere to Owner Notification Policy as detailed in Village Rules and Regulations document.

 

-          No additional infractions have been reported to date

 

 


 


Chapter

9

 

Bolton Valley Updates

State of the Mountain Update

Larry Williams, Owner of Bolton Valley Resort

 

Business plan is on track 

   -George Potter General Manager

   -Skiers attendance was up ~15%

   -Operating within budget, lost less money than last year, still at risk 

   -Lack of beds is an issue

   -Would like to buy base lodge and Sport Center

   -Season passes include Sport Center next season

 

Much has been done but much still needs to be done. There have been some position and personnel changes made during the past few years which have improved the operation.

    -Employees have new health care plan and 401k

 

Possible Future Plan Ideas Being Discussed:

   -Picnic Loop Canopy rides on Zip Lines, good revenue producer for Bretten Woods

   -Mountain coaster on rails for summer

   -Snow tubing behind Sport Center

   -Build a 20 room hotel like LCA

   -Expanding 4X4 trail system

   -Two larger KW Wind Turbines on Woodard ridge

 

A reception center (The Ponds) is in operation opposite Timberline.

Many  weddings are booked for this summer/fall and these events are generating summer activities and a need for more rental units.

   -27 bookings would like 35

 

If there were more rental units available there could be more destination skiers accommodated and that would enhance the resort, ski operations, food & beverage services and allow for other amenities.

 

Parking during ski season is always a problem. The resort hopes to have managed parking next season. This would prevent each car from taking two spaces as well as keep ski customers out of condo resident parking areas. Having customers arrive and giving them no direction as to where to go was not good for the customers, the mountain, or the condos. Tighter parking and a little rearranging of the parking tiers themselves would make it possible to park most customers on all but the busiest weekends.

 

Opening day ski season 

   -Open December and  close first week April

   -Looking into two terrain parks expert and intermediate

 

Potable Water Issues:

   -Two new ground wells yielding water, 21 & 23 = Total of 44 Gallons a minute

   -Two existing wells by resort @ 15 Gallons a minute

   -70 Gallons a Minute, enough to get off surface water supply in Aug/Sept 2010

 

 

HWY 89 Ramp Exit

   -Nothing in the plan

   -Town has no money

   -Effort is on the town

   -Not being driven by resort, could be considered self serving

 

Redstone development updates 

   -Still no firm plans at this time 

 

Plans are at drawing board level (nothing for a few years) for 24 condo units in the base area and 25 condos along the trails.

   -Looking into foreign investment, EB5 funding similar to what Jay Peak resort did

 

Development after that is planned for Broadway at either end of the trail. Redstone is putting together a “Master Plan” to submit to the Town. It will include future growth at about 10 to 20 units per year.

    -Phase one could include a new hotel

 

Picnic loop is zoned as single housing dwellings

   -Could be develop in 10 years?

   -Resort has discussed developing and/or building a parking lot behind Village Condo

 

2005 Town Rezoning

   -Broadway Forest District

   -25 acres per dwelling

   -19 lots, conceptually

   -Possible development as soon as this summer of 2005

   -Cannot build above 2,500 feet, ie just below lift one mid-station

 

Resort Rental Pool

Resort doing some capital improvements on hotel and rental pool.

The mountain simply needs more rental units and realizes there have been some problems in the past. Nelson asked Larry Williams to put together a rental proposal that could be distributed to owners that do not currently rent but could with a few assurances owners will actually get paid.

 

BV/Redstone Nordic trail improvements 

    -Proposing to hire full time groomer for Nordic trails

    -Looking at doing night skiing on Picnic loop

    -Improving drainage on the trails

   -Looking at building a Wilderness cabin

   -Sprucing up Bolton cabin, rental income maker for the wilderness experience

 

Summer events, Mnt Biking, BAC, etc. 

   -No Mountain Biking this year

   -Off road Land Rover events on Wilderness

 

1984 storm water permit lapsed update 

   -Nelson Minerly, engineer and Mel Croshier working together on plan

   -Better to renew/grandfather in than get new permit

   -Affects resort and six condo Assoc., prior to LCA

   -Estimate cost for various Assoc. , $150 renewal and engineering, along with $55 each year

   -Several permit requirements the resort needs to complete by Village property

   -Several resort items we identified by the engineer approving the permit each year are still not

     completed

   -Larry mentioned the majority of the mandated repairs are complete


 

Potable Water Initiatives Update

Wynne Kirschbaum, Bolton Valley resident, is heading up initiatives to deal with potable water issues on the mountain. Latest updates can be found on the Bolton Valley Community Forum website

 

     https://home.comcast.net/~itele2/

 

Jason Williams – Village Director

   -09/10/08

 

Wynne Kirschbaum (Snowdrift Lane) and I had a very productive phone conversation with the counsel for the Department of Public Service regarding the ongoing issue and pending petition to the Public Service Board.  It is the Department's intent to come to an agreement before we are engaged in a protracted legal proceeding before the Board.  Wynne (who is the authorized representative of the "community") and I (an informed bystander!) are very supportive of this initiative.

 

The Department is going to contact Larry and propose a settlement of the issue that incorporates many of our concerns.  Briefly, they are:

 

1.  A 30-day refund for the period during which we were under a boil water order.  Legally, this is a slippery slope, so the only way we can conceive of actually getting this refund is through a settlement.  Also, even though it will be a nominal amount of money, it goes a long way to demonstrating Larry's willingness to work with the community in good faith.

 

2.  The incorporation of the stipulations of the Water System's Temporary Operating Permit into a Public Service Board order.  The order would simply reinforce all of the aspects of the permit, but would add some sort of penalty.  Currently, it is our understanding that the only recourse the Water Supply Division (entity that issued the permit) has for reprimanding the Water System for a violation of deadlines or any aspect of the permit, is the revocation of the permit.  This is not an effective check and

balance system!

 

3.  The Water System needs to develop a better plan for regularly communicating with the community.  We offered several options: regular articles in the Bolton Gazette, postings on the Bolton community website, e-mail distribution lists, and better and more coherent information in regular mailings.  We particularly pointed out the relative lack of information regarding the water testing.  The System will inform us that the haloacitic acid level is high, but we don't get any of the details.

 

4.  We have asked that the Board incorporate our concerns about future development and the potential demand that may have on the Water System into any order.  It is clear that Larry is intent on drilling wells and pumping that water into the System, resulting in less reliance on surface water, which will result in less chlorination and ultimately less chlorination byproduct.  Our concern is that he will do this, relieving the problem for now, but as he increases residential demand on the system,

he will simply go back to using surface water, which will bring us back to where we started.

 

5.  That the Water System convene a community advisory board or a task force of interested neighbors and community members to work with the System on a regular basis.  This would not be a regulatory or governing board, but would allow community representatives to be in regular contact with Larry, would allow him the opportunity to update the community on a regular basis and would hopefully build a better rapport between us and them.

 

Let me know if you have any questions, J

 

 


 

Bolton Valley Fire District Update

Kurt Ries, Village Director

 

BV Fire District Mission Statement:

The water and sewer district is concerned with managing Water and Sewer costs and the need for good drinking water and the responsible disposal of our waste. We as property owners on the mountain are well aware that the Bolton Valley resort owners changed on a regular basis and every new owner had good intentions, but the time has come to take the water system and turn it into a municipal entity.

 

The Bolton Valley Fire District was started by homeowners and business members to ensure the residents and businesses on the Mnt:

1.)       Control operation costs

2.)       Good potable drinking water

3.)       Treated and untreated waste is being properly handled

4.)       Manage development by where and who can connect to system

 

The system has been neglected over the years and is currently going through major renovations. The water and waste water system had been the only profit center for a while now as the resort changed hands over the years. We are attempting to move forward as a public entity and our goal is to own the system along with any improvements the new owner, Redstone, has made as mandated by the state.

 

06/20/07 First Fire District meeting held in four years

   -Lynda M. DesLauriers is new Prudential Chair

   -First action to contact Redstone see if they are open to open W/S purchase discussion

   -Second action to come up with a viable business case why we want to do this

 -The Bolton Valley Fire District does officially exist and is filed with state

 -BV Fire District does not currently own any part of the BV W/S infrastructure

 

Assoc. made a desperate plea for help at the 2006 and 2007 Assoc. Annual Owner Meetings

   -Folks if you do not step up now and assist the Fire District it will not come to fruition!!

  -Very little response from home owners on the mountain

  -Have to be full time resident to vote, about Timberland to Broadway

  -Really need a grass roots effort from the owners to bring BVFD to fruition

  -07/10/07 update, Mike McKenna - mm@shotgunflat.com, has expressed interest in helping

 

Redstone is open to selling to the Fire District

   -Larry mentioned at 05/19/07 Pres meeting probably good idea

   -Fire district would need to commit to Redstone dev needs

 

 Redstone is doing the required major renovation imposed by the state and needed for expansion

   -Usage went up from seasonal to about 80% year around residents in last 5 yrs

   -System is at capacity, only deeded property can currently connect

   -Redstone is making needed repairs to the leech field/septic system

   -Redstone has control to tie into waste water treatment plant this side of Joiner Creek

   -About halve of the waste water being treated is from major storm water infiltration into the

     system, Redstone is working with engineers to correct

   -W/S has been 10% profit margins, with current major renovations Redstone breaking about

     even

 

Water Quality

Our drinking water regularly exceeds state/fed limits, because of the disinfectants chemicals being used

   -There maybe more extensive filtration systems that can be used to reduce the amount of

    disinfectants use to treat the surface water

   -Current water supply is surface, out of Joiner creek, requires someone to constantly monitor

   -Well water is better and is treated w/ chorine and requires less treatment and monitoring

   -Redstone has drilled 3-4 good wells on the Mnt, looking drill more summer of 2007

   -New wells about 48 gals a min, can only supplement not supply the needed water

   -Difficult to find good water on mnt, no reliable source

   -2004 actually had to truck in water

 

What are the benefits of Fire District verse privately held corporation like Redstone

   -Fire District is probably not going to reduce resident’s costs, maybe %25????

   -Currently the most profitable entity of mountain

   -With the major repair cost Redstone been low profit margins last two years

   -Fire District municipality is nonprofit, and owned by residents

   -W/S has been 10% profit margins, with current major renovations Redstone breaking about

     even

   -Fire District would have control over rates

   -Fire District Municipality can obtain low interest grant monies

   -Fire District can obtain rebates for residents on water saving devices

   -Residents have control over future development and tying into system

   -Fire District has no business plan for fixing infrastructure or insuring potable drinking water

 

Vermont has cost cap on how much can be charged for water

   -There is no cap on sewer costs

   -One bedroom QTR Water $17.35, Sewer $153.15

   -There are no water meters; cost is calculated from number of bedrooms

   -1998 Ned Hamilton excessively raised sewer fees, subsequent resort owners continue the tradition

   -Roger McCormick and Ken Richardson have law suite open against Hamilton’s excessive

    rising of rates. Not aware of any movement on these case in quite some time

 

Water Meters

PROS - owner would be charged W/S on what they actually used

CONS -Seasonal owners use would need to be covered in base rate

 

Our drinking water regularly exceeds state/fed limits, because of the disinfectants chemicals

   -There maybe more extensive filtration systems that can be used to reduce the amount of

    disinfectants use to treat the surface water

 

Snippet from Catamount/Bolton Valley Water & Sewer, LLC Water Quality Report 2004

Explanation for violation(s):

We routinely monitor for the presence of drinking water contaminants. Testing results were sampled the last four quarters of 2004 that show our system exceeds the standard, or maximum contaminant Level (MCL), for Total Holoacetic Acids. The Standard for Total Haolocetic Acids is 0.60 mg/1. The running annual average result was .099 mg/1.

 

Actions taken to address the violation(s):

Catamount/Bolton Water & Sewer, and the State of Vermont's Water Supply Division, have been working together to determine ways to reduce the levels of Total Haloacetic Acids. Haloacetic Acid is the by-product of drinking water disinfection. We have been working with the State to reduce the levels and still ensure that the chlorine level is sufficient to disinfect the water supply for safe drinking. Our future plan is to begin developing groundwater supplies as part of an effort to eventually eliminate the need for the existing surface water plant.

 

Ken Richards previous owner of Black Bear Inn was the primary force driving the Fire District initiatives

The Water and Sewer district is concerned with the need for good drinking water and responsible disposal of our waste. We as property owners on the mountain know that the Bolton Valley resort owners change on a regular basis and every new resort owner had good intentions, but the time has come to take the water system and turn it into a municipal entity.

   -The Bolton Valley Fire District does officially exist and is filed with state

   -BV Fire District does not currently own any part of the water/sewer infrastructure

   -Attempting to negotiate with Redstone the sale and cost of the system

   -Nelson Minerly has a keen interest but is not a resident

   -Ken has sold the Black Bear and is no longer involved

   -Have to be full time resident to vote, about Timberland to Broadway

   -Emanate domain presiding to force the sell, still on hold and very adversarial

       -Advisors stated that they felt Ken was moving to fast on obtaining W/S

       -Hoping Redstone will come to their senses and sell to municipality

 

Village Assoc. has taken Water and Sewer cost out of your assessments 05/01/04

   -The above mention turmoil was a primary driving factor

   -Along with artificially inflating Village Assessments rates to perspective buyer

   -Bolton Water quality report and research posted to our Village web site

 

Steve McLeod Drinking Water Quality Report

   -Assoc. not going to be involved, as unit owners we are involved

   -Steven McLeod discussed his finding and write-up

   -Steve’s write-up along with the Bolton water quality report is posted to our Village web site

   -Darlene’s water quality findings are posted to the Village web site as well

 


 

 

Bolton Valley Presidents Council Update

Kurt Ries, Village Director

 

Propane Costs:

There are several options including Propane Coop that shows good potential in lowering our heating cost, however for Village, the board is unable to find owners for a committee to explore lower pricing.

   -Black Bear pays .89 w/ Agway and Associations pay 1.49 -- 2004/2005 pricing

   -06/22/05 Blue Flame memo fixed pricing going up $1.49 to $1.80

   -07/27/06 Blue Flame memo fixed pricing going up $1.80 to $1.95

 

Village, Wentworth, Courtside I & II and Bear Run Condos are all at special Blue Flame fixed pricing of $1.95 per gallon until end of June/July 2007. The $1.95 fixed rate offered to the Associations on the mountain are less than Blue Flames standard prebuy pricing.

 

Village units use an average of 200 - 400 gals a heating season

Standard Blue Flame 2006/2007 Prebuy pricing is as follows:

   -400 gals - $2.79

   -500 - 700 gals - $2.19

   -1000 gals - $2.14

 

Propane Coop:

One supplier for all Assoc. should be able to offer better price point

   -If supplier is not Blue Flame Assoc. Assoc. will need to buy propane infrastructure

   -Village has 20 out of 21 units heating w/ propane

   -Village 3 bedroom unit 2003/2004 uses about 750 gal’s propane

   -Village propane infrastructure buy-out total 3,779.86 - 2004 dollars

   -A Coop would tie all the Assoc. into single vendor contract

 

2004/2005 dollars:

1.49 - .89 = .60 cents Gal saving

19 units x 750 gals = 14,250 gals x .60 = $8,550 total savings

3,779.86 cost / 8,550 saving = .4 years to pay off infrastructure costs

 

Courtside Owners Meeting May 2006:

Courtside One reacted favorably to purchasing the propane infrastructure. An internal committee will be formed to determine how to pass the costs (and savings) along to the gas users in the association if this proposal passes.

   -Still working out how to distribute charges as not all units have propane heat

   -$11k for infrastructure, have buried tank

   -Agway had no interest

   -Paterson very interested

 

Pres. council has $980 in checking

   -Donated by each Assoc.

   -Kurt is encouraging not to spend/waste on legal fees for the water sewer disputes going on

 -Nelsen looking into how distribute funds back to Assoc.


 

Pets, all Associations getting many complaints about pets running loose

   -Town has lease law, however clause of under voice control

   -Could jeopardize Assoc. master policy

   -Believe Village is covered w/ our revised Bylaws and R&R

   -Nelson wants to hold meeting with Assoc. and resort

   -Kurt suggested this is not a resort or Assoc. issue to enforce

   -Per Town of Bolton letter 02/16/05 call Animal Control Officer

   -Assoc. having a common R&R doc would help in these types of situations

 

05/20/06 CC1 implemented penalties for pet clean up

   -Penalties for not cleaning up pet droppings, $25 first offense, $50 second offense

   -John Herr Prop Agent using camera

   -CC1 changed bylaw/RR voice control is not an option

 

Storm Water Permits:

Explanation

Mountain Operations and Development (Bolton Valley Resort) has received a letter from the State of Vermont Department of Environmental Conservation, Water Quality Division.  It states that one of our storm water systems is currently discharging without a valid permit in violation of 10 V.S.A. $1264.     Your Association was part of the original permit that expired in 1986.

 

To continue further with this permitting process we will need signatures from each duly authorized representative of the following Associations on the Notice of Intent To Discharge Storm water:  Courtside I, Courtside II, Village, Liftline, Sports Club Condominiums, Wentworth I, Wentworth II, Wentworth III, the Sports Center, LDI, Base Lodge Condominiums and perhaps the LCA. 

   - Permit belongs to the resort

   -1,400 expired permits State did not notice

   -All needed Assoc. signatures obtained in 2005

 

What has been done?

BVR/MOD obtained an extension until 15 September 2005.

07/06/05 Bernie Chenette indicated he does not see any problem with certifying that everything was installed according to the original design and has been properly maintained.

 

What do the Assoc. need to do?

Well before permit extension runs out:

   1.) Assoc. read the following information and understand the issue

   2.) Assoc. representative sign the attached NOTICE OF INTENT (NOI)

   3.) Pay cost of reinstating old permit

 

Early estimates, one time $150 for engineer and annual cost of $55 per impervious acre and $50 file fee per Assoc.

   -Do we want to use are Pres council funds ($980) for the cost of renewing the permits?

 

Update on renewing Storm Water Permits:

Melody Crosier asked me to thank all of you for your cooperation in the process of renewing the original permit. Chenette Associates will bill each association $ 150. for his engineering inspection and doing the “leg work”. The following is a breakdown of total impervious acreage permit fee due the State of Vermont from each entity. MOD has paid the fees already so we owe them. If anyone wants the breakdown between roof and parking lot impervious acreage please send an email to me. MOD 6.3 / $ 345. , CC I  .53 / $ 29. , CC II .16 / $ 9. , LL .25 / $ 14. , Sports Center  .32 / $ 17. ,  Base Lodge .14 / $ 8. , Sports Club Condos .19 / $  10. , WW I .17 / $ 9. , WW II .2 / $ 11. , WW III .29 / $ 16. , LDI .15 / $ 8. , Base Lodge Condos .25 / $ 14. , LCA .34 / $ 19. , Village .65 / $ 36. We are renewed at the original rate which is 1/6 of the new rate. This buys us time to investigate other options for next year.


 

Appendix A – Village Financial Statements